Laserfiche WebLink
uANM'E15 oE51CaJEPS COw5u1N115 <br /> agreed that one year of quarterly groundwater monitoring would be performed (Table 1-1) It <br /> •� was also agreed that a corrective action plan (CAP) would be prepared following the completion <br /> of one year of quarterly groundwater monitoring (Roy F. Weston, Work Plan for Phase IV Site <br /> Investigation and Quarterly Groundwater Sampling, February 1996). The Phase N investigation <br /> and first round of groundwater sampling confirmed that soil contamination is present in the <br /> vicinity of MW-2A and that groundwater contamination is not present south (up gradient) of the <br /> former USTs The fourth quarter of groundwater sampling was completed in May 1997 <br /> This report is the third quarterly monitoring report and presents the results of continued <br /> groundwater sampling following the schedule presented in Table 1-1. The CAP was submitted <br /> to EHD in January 1998 <br /> Table 1-1 <br /> Sampling Schedule <br /> Quarter Monitor Wells to be Sampled <br /> First MW-2A and MW-9 <br /> Second MW-2A, MW-3A, MW-4, MW-6, MW-7, and MW-9 <br /> Third MW-2A and MW-9 <br /> Fourth MW-2A, MW-3A, MW-4, MW-5, MW-6, MW-7, and MW-9 <br /> L 1PROJECmSANJOQMSA\HSA_99 APR 3 May 19N <br />