My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0010376
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
S
>
SUTTER
>
145
>
2900 - Site Mitigation Program
>
PR0543041
>
ARCHIVED REPORTS_XR0010376
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/18/2020 3:14:45 PM
Creation date
5/18/2020 3:01:37 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0010376
RECORD_ID
PR0543041
PE
2960
FACILITY_ID
FA0024604
FACILITY_NAME
HUMAN SERVICES AGENCY
STREET_NUMBER
145
Direction
S
STREET_NAME
SUTTER
STREET_TYPE
ST
City
STOCKTON
Zip
95202
APN
14912016
CURRENT_STATUS
01
SITE_LOCATION
145 S SUTTER ST
P_LOCATION
01
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
uANM'E15 oE51CaJEPS COw5u1N115 <br /> agreed that one year of quarterly groundwater monitoring would be performed (Table 1-1) It <br /> •� was also agreed that a corrective action plan (CAP) would be prepared following the completion <br /> of one year of quarterly groundwater monitoring (Roy F. Weston, Work Plan for Phase IV Site <br /> Investigation and Quarterly Groundwater Sampling, February 1996). The Phase N investigation <br /> and first round of groundwater sampling confirmed that soil contamination is present in the <br /> vicinity of MW-2A and that groundwater contamination is not present south (up gradient) of the <br /> former USTs The fourth quarter of groundwater sampling was completed in May 1997 <br /> This report is the third quarterly monitoring report and presents the results of continued <br /> groundwater sampling following the schedule presented in Table 1-1. The CAP was submitted <br /> to EHD in January 1998 <br /> Table 1-1 <br /> Sampling Schedule <br /> Quarter Monitor Wells to be Sampled <br /> First MW-2A and MW-9 <br /> Second MW-2A, MW-3A, MW-4, MW-6, MW-7, and MW-9 <br /> Third MW-2A and MW-9 <br /> Fourth MW-2A, MW-3A, MW-4, MW-5, MW-6, MW-7, and MW-9 <br /> L 1PROJECmSANJOQMSA\HSA_99 APR 3 May 19N <br />
The URL can be used to link to this page
Your browser does not support the video tag.