My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_FILE 2
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PALM
>
11651
>
2900 - Site Mitigation Program
>
PR0503361
>
COMPLIANCE INFO_FILE 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/18/2020 3:31:06 PM
Creation date
5/18/2020 3:13:23 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
COMPLIANCE INFO
FileName_PostFix
FILE 2
RECORD_ID
PR0503361
PE
2960
FACILITY_ID
FA0005798
FACILITY_NAME
SOUTHWEST HIDE COMPANY
STREET_NUMBER
11651
STREET_NAME
PALM
STREET_TYPE
LN
City
RIPON
Zip
95366
APN
22809005
CURRENT_STATUS
01
SITE_LOCATION
11651 PALM LN
P_DISTRICT
005
QC Status
Approved
Scanner
TSok
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
139
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Time Line: <br /> As stated above, the two old production wells on the Southwest Hide Company <br /> property in Manteca have already been abandoned as per the designed procedure. <br /> The aquifer performance test will proceed once the inspection in mid-J.._,1_,ry is <br /> completed and the necessity for additional drilling has been determined. It is <br /> thought that the test will take place near the end of January, 1990. <br /> The length of the main production well casing, on the Southwest Hide property, <br /> will be viewed in mid-January once the pump has been removed. It is Duped that <br /> this well can be used during the pump test. A new production well may meed to be <br /> constructed to replace the Southwest Hide Company water supply. <br /> Plans to further investigate the vertical extent of the ground water have <br /> consisted of drilling and monitoring the one hundred forty foot well adjacent to <br /> well 7 and 7A. The first set of ground water data from this well is included in <br /> appendix A and the second set of data was submitted to the laboratory last w,_ek. ' <br /> Ground water elevations have been monitored on a regular basis and consistently <br /> follow the trends of the two adjacent wells. It is felt that results from the <br /> new water quality analysis should be examined prior to exploring the possibility <br /> of constructing an additional deep monitoring well . <br /> The brine recycling system design can proceed now that Southwest Hide Co» hany has <br /> completed plans for its northern California hide processing system whicls l _: Iudes <br /> the closing of it's Fresno plant and the opening of it's Modesto plant . MEC has <br /> retained a mechanical engineer on staff and is in contact with an engine <br /> experienced in evaporative processes. It is expected that plans for the <br /> recycling system will complete by February 15, 1990 which will allow for March <br /> 1990 construction. <br />
The URL can be used to link to this page
Your browser does not support the video tag.