Laserfiche WebLink
i Geomatrix <br /> • data review summary, QA/QC results, and findings; <br /> • copies of laboratory reports and chain-of-custody forms; and <br /> • conclusions. <br /> 8.0 SCHEDULE <br /> The proposed soil investigation will be conducted during two separate field events. The soil <br /> investigation will occur in January 2006 at the French Camp Facility and in June 2006 at the <br /> Lathrop Facility. The timing of the investigations is based on access to soil below the footprint <br /> of each stockpile. Pre-field activities will be initiated following RWQCB approval of this <br /> Work Plan. A summary of the anticipated schedule is as follows: <br /> Expected Duration <br /> Task Description (Weeks from RWQCB Approval) <br /> • Permits 2 weeks <br /> • USA notification and utility locating 3 days <br /> • Soil sampling (1) 2 days at each Facility <br /> • Laboratory Analysis 2 to 3 weeks following sampling <br /> • Reporting 3 to 4 Weeks after obtaining soil data <br /> (1) January 2006 at French Camp and June 2006 at Lathrop. The actual schedule may be affected by factors such <br /> as drilling subcontractor availability,access,and weather. <br /> PAI 0626.000.0\DocsVvII.T Soil Work Plan.doc 1] <br />