My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PORT
>
0
>
2900 - Site Mitigation Program
>
PR0522547
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/18/2020 4:40:38 PM
Creation date
5/18/2020 4:35:10 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0522547
PE
2960
FACILITY_ID
FA0015361
FACILITY_NAME
RICE TERMINALS
STREET_NUMBER
0
STREET_NAME
PORT
STREET_TYPE
RD
City
STOCKTON
Zip
95212
APN
14502009
CURRENT_STATUS
01
SITE_LOCATION
PORT RD A
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
95
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
k'q KLEINFELDER <br /> 6. Samples are collected with a disposable bailer or bladder pump into appropriately <br /> prepared bottles provided by the analytical laboratory. <br /> 7. Samples for metals analysis are usually filtered in the field at the time of collection. <br /> 8. Samples are immediately labeled and placed in an iced sample container. At the end of the <br /> day, the samples are delivered to the analytical laboratory under chain-of-custody control. <br /> B-5 Vadose Zone Monitoring <br /> 1. Prior to conducting lysimeter sampling, the pressure-vacuum equipment is checked and <br /> cleaned. A Soil-Moisture hand pump with a pressure-vacuum gage is used to measure <br /> residual and implied pressure-vacuum. Nitrogen gas is used to purge the lysimeter <br /> system for sampling. An air pump is available as a back up. <br /> 2. Approximately one week to one month prior to conducting the sampling, the residual <br /> pressures at the air-line of each lysimeter are measured ad the vacuums reset to <br /> manufactured recommended value (usually 50 centibars). The measurements and applied <br /> vacuums are noted on a sampling log form. Kleinfelder has found that resetting the <br /> lysimeters vacuums before the sampling yields good sample recovery. <br /> 3. The residual pressures are measured just prior to collecting the sample. The water line is <br /> then opened and nitrogen gas applied to the air line until either fluid or air is discharged <br /> (for dry lysimeters). The sample is contained in a 1 liter unpreserved bottle and the <br /> volume recovered is estimated. The fluid is then poured into appropriate preserved or <br /> unpreserved bottles of the requested analysis. <br /> 4. After the sample is collected, the lysimeter vacuum is reset to the manufacturer's <br /> recommended value. The lysimeter is also tested to evaluate potential leaks that may <br /> cause vacuum pressure loss. <br /> B-6 Leachate Monitoring <br /> 1. The leachate riser or wells are first opened and allowed to equilibrate with the <br /> atmosphere. <br /> 2. The leachate elevation is then measured from a set location using a conductivity-based <br /> water-level meter. The level is generally measured from a surveyed mark on the north <br /> rim of the casing. <br /> 3. A leachate sample is then collected using a clean, disposable bailer. <br /> 4. The sample is labeled and immediately stored in an iced cooler pending transport to the <br /> analytical laboratory. The sample is logged on a chain-of-custody. <br /> 43851.EOI/ST05R158/DH:Iv Page B-6 <br /> ,52005,Kleinfelder, Inc. February 9,2005 <br />
The URL can be used to link to this page
Your browser does not support the video tag.