My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WP0040652
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
3530
>
4200/4300 - Liquid Waste/Water Well Permits
>
WP0040652
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/18/2020 4:55:43 PM
Creation date
5/18/2020 4:50:17 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4200/4300 - Liquid Waste/Water Well Permits
RECORD_ID
WP0040652
PE
4374
STREET_NUMBER
3530
Direction
W
STREET_NAME
YOSEMITE
STREET_TYPE
AVE
City
LATHROP
Zip
95330-
APN
24140009
ENTERED_DATE
3/19/2020 12:00:00 AM
SITE_LOCATION
3530 W YOSEMITE AVE
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
TSok
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Tylox McMilla>nss Well Service <br /> 12302 Andes Ave.Bakersfield CA,93312 <br /> Phone:(916)761-5224 Email:mcmillans52 I Qzmail.com <br /> Website:www.wellblaster.com <br /> Date: March 18,2020 <br /> BLASTING WORK PLAN <br /> Well:Parerra Well 12 Inch Location:3552 Yosemite Ave Plan date and time:Pending <br /> Casing 12-inch ID Steel to 50 feet Lathrop,CA <br /> 4 Sealing pipe Boosters <br /> GL Density g/cc 1.55 g/cc <br /> Detonation Velocity 24,000 ft/s 7,315 m/s <br /> Casing Diameter 12 inches <br /> Charge Wt. 0.15 Kg 150 grams <br /> 10' Detonation pressure 207 k/bar <br /> Total energy ea. 13,997 k/bar <br /> Pressure at casing 15.47 k/bar 231,567 psi <br /> Pressure at 10 feet 0.00 29 psi <br /> 20' Detonator placed at 20 feet <br /> Explosive Cord <br /> Density g/cc 1.60 g/cc <br /> Detonating Cord Detonation Velocity 22,000 ft/s 6,706 m/s <br /> Start 20 feet Casing Diameter 12 inches <br /> 30' Intervals Linear Grains 50 gr/ft 3.24 g/ft <br /> End 50 feet <br /> Strength 50 grain Detonation pressure 180 k/bar <br /> Total 30 feet <br /> Total energy pef ft. 22 k/bar <br /> Booster Placement Pressure at casing 0.19 k/bar 2,892 psi <br /> 40' Start 20 feet *These are estimated pressure for a empty well <br /> Intervals 10 feet Site procedure <br /> End 50 feet 1. Check site and measure well depth <br /> Total 4 Boosters 2. Clear work site of all unessential personal <br /> 3. Lower charges and drop pipe into the well <br /> 50' 4. Pump sealing material to top of well <br /> 5. Check and clear blast area(sound blast warning) <br /> 6. Arm explosives <br /> 7. Confirm area clear(final blast warning) <br /> 8. Detonate charge <br /> 9. Check hole and sound all clear <br /> 60' 10. Refill cement to top of well to form a mushroom cap <br /> Total Explosives Name of Blaster Preparing Plan: Tylor McMillan <br /> 1.53 lbs. <br /> 70' *Tylor McMillan's Well Service reserves the right to change or modify the blast plan in <br /> any way necessary to maintain the safety of all personnel onsite and in surrounding <br /> areas. <br /> 80' <br /> 90' <br />
The URL can be used to link to this page
Your browser does not support the video tag.