Laserfiche WebLink
Instructions for Using the Onsite Tiered Permitting - Flowchart <br /> (For non-RCRA or exempt hazardous waste facilities conducting onsite treatment. For <br /> example, generators treating waste onsite within 90/180 days are not required to get a <br /> permit pursuant to federal regulations.) <br /> Using the TP Flowchart <br /> 1St column 2nd column 3rd column 4t" column <br /> Waste Treatment Volume Concentration <br /> Type Treated <br /> What is the How is the Tiers are often Tiers often <br /> waste waste being dependent dependent upon <br /> stream? treated? upon volume concentration . <br /> What is the treated . <br /> process <br /> used? <br /> DTSC 10/30/17 Page 1 <br />