Laserfiche WebLink
If container is exempt <br /> X NO <br /> 11 a per Title 22, 66261.7 authorization <br /> required <br /> (fabric <br /> tainers < 110\ Rinsing <br /> on capacity (no ■ Crushing <br /> paper, cardboard, ■ Shreding NO volume limit CESW <br /> or other absorptivematerial) Grinding <br /> , § 25201.5(a)(2) Puncturing 500 lbs total/mo./ CESQT <br /> — facility+ <br /> >500 lbs/mo. PBR <br /> 11b <br /> NO authorization required <br /> U§ 25201.16 <br /> Puncturing if handler complies with <br /> ■ Draining HSC §25201.16 (h) <br /> ■ Crushing requirements <br /> SB1158 (Stats. 2001, Ch. 450) <br /> ■ Treatment of resins including multi- <br /> component and preimpregnated resins NO volume limiCESW <br /> 12 Mixed or Cured in accordance with manufacturer's <br /> instructions (Stats. 1994, AB 3577, Ch 276) <br /> ins <br /> <500 lbs total/mo./ CESQT <br /> (HLSC, § 201.5(c)(1) — <br /> _ Treatment of Multi-component facility+ <br /> No resins - Mixed in accordance with <br /> manufacturer's instructions <br /> >500 lbs/mo. PBR <br /> DTSC 10/30/17 Page 19 <br />