My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2020
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HARLAN
>
10182
>
2200 - Hazardous Waste Program
>
PR0514315
>
COMPLIANCE INFO_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/7/2021 2:07:15 PM
Creation date
5/18/2020 5:18:55 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
2020
RECORD_ID
PR0514315
PE
2229
FACILITY_ID
FA0010410
FACILITY_NAME
DELTA TRUCK CENTER
STREET_NUMBER
10182
Direction
S
STREET_NAME
HARLAN
STREET_TYPE
RD
City
FRENCH CAMP
Zip
95231
APN
19327018
CURRENT_STATUS
01
SITE_LOCATION
10182 S HARLAN RD
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
300
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Cyanide Treatment (T22, § 67450.11 (d)(2D <br /> F Spent Solutions managed in� <br /> accordance with the requirements \I Electrowinning (only for To the aqueous solution <br /> of§ 67450.11(d)(6). j metal recovery) in wastCe sDtreoa E A, B, PBR <br /> T22, § 67450.11 (d)(2)(F) <br /> Spent Solutions managed in Resulting solution must be <br /> accordance with the requirements Slow Bleeding to the treated b ti <br /> aqueous solution in oxidation, <br /> of§ 67450.11(d)(7). ► alkaline chlorination, PBR <br /> T22, § 67450.11 (d)(2)(G) waste streams(A) and (C) electrochemical oxidation, <br /> / <br /> ion-exchange, or <br /> reverse osmosis <br /> Additional Requirements for Dilution of Process Solutions: <br /> • Total cyanide concentration limited to 5,000 mg/I after dilution <br /> • Written approval from the agency operating the POTW <br /> • Waste analysis plan (cyanides) <br /> • The residual solids removed are recycled by a facility that recovers metals including documentation <br /> • By January 30 - Prepare justification statement when residuals are not recycled for the previous calendar year <br /> • Records maintained at the facility for 3 years <br /> For all Cyanide Treatments under PBR: <br /> -Comply with Best Management Requirements <br /> -Employee training (Initial and annual training to employees, who handle cyanide process <br /> solutions, cyanide rinse waters, or manage cyanide waste) DTSC 10/30/17 Page 25 <br /> -Evaluate cyanide alternatives every 4 years <br />
The URL can be used to link to this page
Your browser does not support the video tag.