RECOMMENDATIONS FOR FUTURE WORK <br /> Based on the data accumulated thus far, a detailed work plan for <br /> future work follows. In general , the work plan involves installing <br /> additional groundwater monitoring wells to more precisely determine <br /> the gradient and direction of groundwater flow. These wells will <br /> also assist in determining both the horizontal and vertical extent <br /> of the contamination plume. <br /> Soil borings are also proposed to be drilled around the evaporation <br /> ponds to aid in the evaluation of the integrity of the ponds. <br /> During the continued monitoring and sampling of the groundwater, <br /> the Subchapter 15 requirements will be written and a water quality <br /> impact report will be prepared. <br /> 5 <br />