Laserfiche WebLink
DRAINAGE: <br /> The project is in a broad flood plane located north of the Calaveras River <br /> and Mosher Slough. The development plans will, in conjunction with the <br /> proposed County of San Joaquin Drainage Plan, deliver its drainage water to Mosher <br /> Slough. <br /> A permit application will be submitted to the State Reclamation Board <br /> showing profile and location of the proposed lift station. <br /> No public terminal drainage system exist for the Morada southeast area. <br /> Provisions for drainage, like public water supply, is handled separately by <br /> each subdivision development, either by way of retention pond, or allowed to <br /> drain along the surface of borrow until it reaches the Highway 99 Frontage <br /> Road borrow ditch. <br /> The county does have a. drainage master plan which extends into the <br /> Morada area, but no date has been set for implementation of this plan. See map <br />