My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
S
>
SAN JOAQUIN
>
345
>
3500 - Local Oversight Program
>
PR0545671
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/19/2020 11:44:18 AM
Creation date
5/19/2020 11:40:42 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0545671
PE
3528
FACILITY_ID
FA0003959
FACILITY_NAME
AT&T CALIFORNIA - UE042
STREET_NUMBER
345
Direction
N
STREET_NAME
SAN JOAQUIN
STREET_TYPE
ST
City
STOCKTON
Zip
95202
CURRENT_STATUS
02
SITE_LOCATION
345 N SAN JOAQUIN ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
71
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
/ INTERn...40NAL TECHNOLOGY CORPORATION <br /> t <br /> 2. Groundwater samples will be collected from the wells once they have been <br /> fi developed. <br /> Hazards: Worker exposure to the identified chemicals could occur due to <br /> fi inhalation of these compounds, inhalation of contaminated dust, or skin contact <br /> with contaminated groundwater. <br /> 3.2 Assignment of Responsibilities <br /> All personnel involved in operations who treat, excavate, trench, handle, sample, dispose of, <br /> or otherwise have a potential for exposure to site specific contaminated materials are subject <br /> to this health and safety plan. <br /> L All rr personnel are responsible for continuous adherence to the safety procedures during the <br /> I performance of the work. In no case may work be performed in a manner that conflicts with <br /> the intent of, or the inherent safety and environmental cautions expressed in these procedures. <br /> After due warnings, personnel who violate safety procedures will be dismissed from the site <br /> + and may be terminated. All field personnel shall be properly trained in health and safety <br /> procedures associated with handling hazardous materials and the safe operation of equipment. <br /> All on-site personnel will be trained as necessary according to the specifications set forth by <br /> 29 CFR 1910.120 and this document. <br /> a <br /> '•- 3.2.1 Project Manager <br /> The Project Manager, will be accountable for ensuring field implementation of the Health and <br /> Safety Plan. As required by rr Policy and Procedures 9021.1, the Project Manager will be <br /> responsible for informing the project's Health and Safety Coordinator of any changes in work <br /> plans so that issues of health and safety and project management may be appropriately <br /> addressed. <br /> r <br /> 3.2.2 Health and Safety Coordinator <br /> ' The project Health and Safety Coordinator will be responsible for development and <br /> coordination of the site health and safety plan. This plan will comply with 29 CFR 1910.120 <br /> and will include medical surveillance, training requirements, hazard assessment, personal <br /> �. protective equipment, and field implementation. The Health and Safety Coordinator will <br /> „ update and change the plan, if warranted by changed conditions, and shall have the only <br /> authorization to effect such changes. The Health and Safety Coordinator will report to the <br /> MZ/o9-2&-9ZR NG/9783.MER 14 <br /> t <br />
The URL can be used to link to this page
Your browser does not support the video tag.