Laserfiche WebLink
1 <br /> b" Table of Contents <br /> 1 1 0 Introduction I <br /> 1 I Site Description I <br />' 1 2 Project History I <br /> 12 1 Phase 1 - Abandonment of Tarek B 2 <br /> 1 1 2 2 Phase 2 - Soil Sampling in Vicinity of Tanks C and D 2 <br /> 12 3 Phase 3 - Removal of Tank A 2 <br />' 1 2 4 Phase 4 - Groundwater and Soil Sampling in Vicinity of Tank A 3 <br /> 1 2 5 Phase 5 - Over Excavation of Tank A 3 <br /> 1 2 6 Phase 6 - Soil Boring and Groundwater Monitoring Well Installation 3 <br /> 1 3 Project Objectives 4 <br /> 2 0 Scope of Work 4 <br /> 1 2 1 Preliminary Site Inspection 4 <br /> 2 2 Health and Safety Plan 4 <br /> 2 3 Groundwater Monitoring 5 <br /> 2 4 Groundwater Sampling and Analysis 5 <br /> 2 5 Environmental Records File Review 6 <br /> 3 0 Summary and Conclusions 6 <br /> 1 3 1 Summary of Environmental Site Investigation Activities 6 <br /> 3 2 Summary of Groundwater Sampling Activities 7 <br /> 1 4 0 Recommendations 7 <br /> 1 <br /> i <br /> 1 <br /> i <br /> 1 <br /> 1 <br />