My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0008260
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
S
>
SAN JOAQUIN
>
711
>
3500 - Local Oversight Program
>
PR0545672
>
ARCHIVED REPORTS_XR0008260
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/19/2020 12:21:15 PM
Creation date
5/19/2020 12:17:05 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0008260
RECORD_ID
PR0545672
PE
3528
FACILITY_ID
FA0005000
FACILITY_NAME
COMMUNITY FABRICARE INC
STREET_NUMBER
711
Direction
S
STREET_NAME
SAN JOAQUIN
STREET_TYPE
ST
City
STOCKTON
Zip
95203
CURRENT_STATUS
02
SITE_LOCATION
711 S SAN JOAQUIN ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
98
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• traffic rated Christy Box with an internal locking cover will be placed over the top of each <br /> monitoring well The top of casing elevation for each monitoring well will be determined <br /> using standard surveying methods <br /> I <br /> GROUNDWATER QUALITY MONITORING WELL DEVELOPMENT <br /> f <br /> Following construction and installation, the groundwater quality moritoring well will be <br /> ideveloped to improve the hydraulic conductivity between the filter pack and aquifer material. <br /> Well development will consist of mechanically surging the groundwater quality monitoring <br /> well with a vented surge block, and bailing to remove material entering the groundwater <br /> quality monitoring well through the well screen as development operations proceed. <br /> Development operations will continue until groundwater bailed from the groundwater quality <br /> i <br /> E monitoring well is clear <br /> • Groundwater generated by the development operation will be placed in securely covered, <br /> clearly marked 55-gallon steel drums and securely stored onsite Final disposition will be <br /> determined based on water sample analytical results <br /> i <br /> f <br /> �icaa o�auz-s� Page 22 <br />
The URL can be used to link to this page
Your browser does not support the video tag.