Laserfiche WebLink
• traffic rated Christy Box with an internal locking cover will be placed over the top of each <br /> monitoring well The top of casing elevation for each monitoring well will be determined <br /> using standard surveying methods <br /> I <br /> GROUNDWATER QUALITY MONITORING WELL DEVELOPMENT <br /> f <br /> Following construction and installation, the groundwater quality moritoring well will be <br /> ideveloped to improve the hydraulic conductivity between the filter pack and aquifer material. <br /> Well development will consist of mechanically surging the groundwater quality monitoring <br /> well with a vented surge block, and bailing to remove material entering the groundwater <br /> quality monitoring well through the well screen as development operations proceed. <br /> Development operations will continue until groundwater bailed from the groundwater quality <br /> i <br /> E monitoring well is clear <br /> • Groundwater generated by the development operation will be placed in securely covered, <br /> clearly marked 55-gallon steel drums and securely stored onsite Final disposition will be <br /> determined based on water sample analytical results <br /> i <br /> f <br /> �icaa o�auz-s� Page 22 <br />