Laserfiche WebLink
CERS Consolidated Emergency Response / Contingency Plan <br /> INTERNAL FACILITY EMERGENCY COMMUNICATIONS OR ALARM NOTIFICATION WILL OCCUR BY (Check all that apply): CII . <br /> 0 1 . VERBAL WARNINGS ; ❑ 2 . PUBLIC ADDRESS OR INTERCOM SYSTEM ; 3 . TELEPHONE; <br /> ❑ 4. PAGERS; ❑ 5 . ALARM SYSTEM; 6, PORTABLE RADIO <br /> NOTIFICATIONS TO NEIGHBORING FACILITIES THAT MAY BE AFFECTED BY AN OFF-SITE RELEASE WILL OCCUR BY (Check all that apply): Cl2. <br /> ❑ 1 . VERBAL WARNINGS ; ❑ 2 . PUBLIC ADDRESS OR INTERCOM SYSTEM ; ❑ 3 . TELEPHONE; <br /> ❑ 4. PAGERS, ❑ 5 . ALARM SYSTEM ; ❑ 6. PORTABLE RADIO <br /> EMERGENCY COORDINATOR CONTACT INFORMATION : C13. <br /> PRIMARY EMERGENCY COORDINATOR NAME: Rodney Woodard PHONE NO. : (209) 8794700 PHONE NO. : (209) 8794780 <br /> ALTERNATE EMERGENCY COORDINATOR NAME: Maria Mueller PHONE NO. : (209) 8794700 PHONE NO. : (209) 8794714 <br /> ❑ Check if additional Emergency Coordinator contact and address information is available onsite or by calling PHONE NO . : <br /> Note: If more than one alternate emergency coordinator is designated, attach a list in order of responsibility . <br /> D . EMERGENCY CONTAINMENT AND CLEANUP PROCEDURES <br /> Check the applicable boxes to indicate our facility 's procedures for containing spills and preventing and mitigating releases, fires and/or explosions. <br /> Dl . <br /> Q 1 . MONITOR FOR LEAKS, RUPTURES, PRESSURE BUILD-UP, ETC. ; <br /> 2 . PROVIDE STRUCTURAL PHYSICAL BARRIERS (e.g., Portable spill containment walls, built-in berms); <br /> Q 3 . PROVIDE ABSORBENT PHYSICAL BARRIERS (e.g. , Pads, spill pigs, spill pillows); <br /> 4. COVER OR BLOCK FLOOR AND/OR STORM DRAINS ; <br /> S . LINED TRENCH DRAINS AND/OR SUMPS ; <br /> [j] 6. AUTOMATIC FIRE SUPPRESSION SYSTEM; <br /> M 7. ELIMINATE SOURCES OF IGNITION FOR FLAMMABLE HAZARDS ; <br /> F!] 8 , STOP PROCESSES AND/OR OPERATIONS ; <br /> 9. AUTOMATIC / ELECTRONIC EQUIPMENT SHUT-OFF SYSTEM; <br /> 10. SHUT OFF WATER, GAS, ELECTRICAL UTILITIES ; <br /> Fol 11 . CALL 9- 1 - 1 FOR PUBLIC EMERGENCY RESPONDER ASSISTANCE AND/OR MEDICAL AID; <br /> 0 12. NOTIFY AND EVACUATE PERSONS IN ALL THREATENED AND/OR IMPACTED AREAS; <br /> 13 . ACCOUNT FOR EVACUATED PERSONS IMMEDIATELY AFTER EVACUATION ; <br /> ❑ 14. PROVIDE PROTECTIVE EQUIPMENT FOR ON-SITE EMERGENCY RESPONSE TEAM; <br /> 15 , REMOVE CONTAINERS AND/OR ISOLATE AREAS; <br /> Q 16, HIRE LICENSED HAZARDOUS WASTE CONTRACTOR; <br /> Q 17, USE ABSORBENT MATERIAL FOR SPILL CONTAINMENT; <br /> 18 . VACUUM SUCTION USING APPROPRIATE VACUUM (e.g. , Intrinsically safe) FOR SPILL CONTROL AND/OR CLEANUP; <br /> 19. DECONTAMINATE PERSONNEL AND EQUIPMENT WITHIN DESIGNATED AREA AND DISPOSE OF WASTEWATER AS HAZARDOUS WASTE; <br /> 20. PROVIDE SAFE TEMPORARY STORAGE OF HAZARDOUS WASTE GENERATED DURING EMERGENCY ACTIONS ; <br /> ❑ 21 . OTHER (Specify): D2. <br /> E . FACILITY EVACUATION <br /> THE FOLLOWING ALARM SIGNAL(S ) WILL BE USED TO BEGIN EVACUATION OF THE FACILITY (Check all that apply): E1 . <br /> ❑ 1 . BELLS; E2. <br /> ❑ 2 . HORNS/SIRENS; <br /> 0 3 . VERBAL ( i.e. , Shouting); <br /> ❑ 4. OTHER (Specify): <br /> THE FOLLOWING LOCATION(S) WILL BE USED FOR AN EMERGENCY ASSEMBLY AREA( S ) (e.g. , Parking lot, street corner): E3- <br /> Front Parking Lot <br /> Note : The Emergency Coordinator must account for all onsite employees and visitors after evacuation. <br /> EVACUATION ROUTE S AND ALTERNATE EVACUATION ROUTES ARE DESCRIBED AS FOLLOWS : E4. <br /> [:11 . WRITTEN PROCEDURES DESCRIBING ROUTES, EXITS , AND ASSEMBLY AREAS ; <br /> 2 . EVACUATION MAP(S ) DEPICTING ROUTES , EXITS , AND ASSEMBLY AREAS ; <br /> ❑ 3 . OTHER (Specify): E5_ <br /> Note: Evacuation procedures and/or maps should be posted in visible facility locations and must be included in the Contingency Plan. <br /> F. ARRANGEMENTS FOR EMERGENCY SERVICES <br /> ADVANCE ARRANGEMENTS FOR LOCAL EMERGENCY SERVICES (Check one of the following): Fl . <br /> 1 , HAVE BEEN DETERMINED NOT NECESSARY; <br /> ❑ 2 . THE FOLLOWING ARRANGEMENTS HAVE BEEN MADE ( Specify): F2. <br /> Note: Advance arrangements with local fire and police departments, hospitals, state and local emergency response teams, and/or emergency services <br /> contractors should be made for your facility, if necessary . Large Quantity Generators must describe arrangements in the Contingency Plan. <br /> Rev. 03/07/17 Page 2 of 4 <br />