My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2020
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
1210
>
2300 - Underground Storage Tank Program
>
PR0231125
>
COMPLIANCE INFO_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2020 8:52:58 AM
Creation date
5/19/2020 2:19:12 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2020
RECORD_ID
PR0231125
PE
2361
FACILITY_ID
FA0003730
FACILITY_NAME
TIWANA GAS & FOOD
STREET_NUMBER
1210
Direction
E
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95210
APN
09403012
CURRENT_STATUS
01
SITE_LOCATION
1210 E HAMMER LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
73
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r <br /> d , - rY <br /> 1210 E Hammer Ln Stockton Ca SR#0081167 Correction to amend permit 3!12/2020 , <br /> E <br /> A <br /> ( Environmental Health Dep l i�t" <br /> � � o [I <br /> __ . COUNTY ---- ., tt <br /> UST SYSTEM RETROFIT OR REPAIR S � TAL [ ;" <br /> (Submit minimum of 3 sets of plans & applications as originals will be retained by EHDj <br /> 1 . Site map enclosed ? YES [ ] NO [ ] <br /> 2 . Submit copies of ICC Service Technician and/or Installer's certificate and all manufacturer training <br /> certificates for each person installing or testing any component that is repaired or replaced . Ensure a copy of <br /> the " Site Health and Safety Plan" is available on the jobsite as required by Title 8. <br /> 3 . Detailed description of work to be completed . List components to be repaired or replaced and attach a <br /> diagram drawn to scale showing location of repairs and/or replacements . If repairing a component, describe <br /> how this will be done . ( If adding piping , UDC's , or other UST equipment, or performing tank top upgrade, <br /> use the UST Installation Application pages 4-8 as necessary for a timely plan review) : <br /> Replace 87 / 91 / diesel spill containers in existing sump. <br /> Replace 87 191 / diesel drop tubes with overfill prevention <br /> 4 . List of equipment to be used (Attach manufacturer's specification sheets showing third-party approval) : <br /> 3) Phil-Tate 85100-1 replacement 5 gallon bucket <br /> 3) EBW 708592902 Defender Overfill Prevention Drop Tube <br /> 5 . Decontamination Procedures : <br /> a . Will piping be decontaminated prior to removal? YES [ J NO [ ] <br /> b . Identify contractor performing decontamination : <br /> Name Phone {�) <br /> Address City Zip <br /> 3 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.