My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2020
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
1469
>
2300 - Underground Storage Tank Program
>
PR0231126
>
COMPLIANCE INFO_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/30/2020 4:27:09 PM
Creation date
5/19/2020 2:59:02 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2020
RECORD_ID
PR0231126
PE
2361
FACILITY_ID
FA0001570
FACILITY_NAME
UNITED # 5447
STREET_NUMBER
1469
Direction
E
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95210
APN
08818030
CURRENT_STATUS
01
SITE_LOCATION
1469 E HAMMER LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
138
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UNDERGROUND STORAGE TANK SYSTEM <br /> SECONDARY CONTAINMENT TESTING REQUIREMENTS <br /> Authority Cited: California Health and Safety Code (HSC); Title 23 California Code of Regulations (23 CCR) <br /> A . Scope <br /> This document addresses periodic testing of underground storage tank ( UST) secondary containment <br /> systems . It supplements State Water Resources Control Board ( SWRCB ) Local Guidance Letter L& 160, which <br /> is available online at www , waterboards . ca . gov/water_issues/ programs/ ust/ leak_prevention/ Igs/ . For <br /> compliance purposes, refer to the actual text of the regulations since the wording in this document <br /> summarizes requirements . All Unidocs forms and documents are available at www. unidocs . org . <br /> B . General Requirements for Secondary Containment Testing <br /> 1e secondary containment must be tested for tightness upon installation , six months after installation ) and <br /> every 36 months thereafter, within 30 days of completion of a repair to a secondary containment <br /> component, and within 30 days of the date of discontinuing the use of a method of continuous <br /> monitoring that automatically monitors the integrity of both the primary and secondary containment <br /> such as components that are hydrostatically monitored or under constant vacuum or pressure . [23CCR <br /> §2637(a ) ( 1)] <br /> 2 . Periodic testing must be completed anytime before or during the month the testing is required . 2 <br /> [23 CCR §2620(e) ] <br /> 3 . Secondary containment equipped with continuous interstitial monitoring that automatically monitors <br /> both primary and secondary containment, such as systems that are hydrostatically monitored or under <br /> constant vacuum or pressure, is not required to be periodically tested . [23 CCR §2637(a )(2)] <br /> 4 . Testing must be performed by a UST Service Technician meeting the requirements of 23 CCR § 2715 ( f) . <br /> [23 CCR §2637(d) ] <br /> 5 . For UST Service Technicians conducting secondary containment testing, the requirement to be trained <br /> and certified by the equipment manufacturer may be obtained through certification by the manufacturer <br /> of the secondary containment system being tested or through the developer of the testing equipment <br /> or test method being used . [23 CCR §2715(f)(2)(A)] <br /> 6 . In the event that no training or certification exists that would satisfy the above criteria , the local UST <br /> Program Unified Program Agency ( UPA) may approve comparable alternate training or certification . <br /> [23 CCR §2715(f) (2) (E)] <br /> 7 . Testing of the following secondary containment components is recommended but not required : <br /> ❑ Secondary containment for tank riser pipes and underground vent lines connected to a UST installed <br /> between July 2 , 1987 and June 30, 2003 , where the tank is equipped with overfill prevention in <br /> accordance with 23 CCR § 2635 ( c ) ( 1 ) ( B ) or ( C ) . 3 [23 CCR §2636(a)(1)] <br /> 1 Per SWRCB guidance, the six month re-test is required after installation of piping, sumps, under dispenser containment ( UDC), or <br /> other components that require "breaking concrete ." Components, such as replacement penetration fittings where all installation <br /> work is done inside containment sumps, do not require the six month re-test. <br /> 2 A UST owner or operator may change the due date of the test by performing testing early, but a test conducted late will not change <br /> the due date . A UST owner or operator that performs a test early may not return to the original due date and must perform the next <br /> test before the end of the new 36 calendar month period . <br /> 3 Refer to the Unidocs Underground Storage Tank System Overfill Prevention Equipment Inspection Requirements ( UN - 117 ) for details . <br /> i <br /> C <br />
The URL can be used to link to this page
Your browser does not support the video tag.