My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2020
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
1469
>
2300 - Underground Storage Tank Program
>
PR0231126
>
COMPLIANCE INFO_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/30/2020 4:27:09 PM
Creation date
5/19/2020 2:59:02 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2020
RECORD_ID
PR0231126
PE
2361
FACILITY_ID
FA0001570
FACILITY_NAME
UNITED # 5447
STREET_NUMBER
1469
Direction
E
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95210
APN
08818030
CURRENT_STATUS
01
SITE_LOCATION
1469 E HAMMER LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
138
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UST System Secondary Containment Testing Requirements - Page 3 of 3 <br /> D . Industry Standards for Testing <br /> 1 . As noted above, the use of industry codes or engineering standards is only allowed in cases where the <br /> secondary containment manufacturer does not have their own guidelines or standards . <br /> 2 . Industry codes must be published . <br /> 3 . The Petroleum Equipment Institute' s ( PEI ) Recommended Practices for the Testing and Verification of <br /> Spill, Overfill, Leak Detection and Secondary Containment Equipment at UST Facilities ( PEI / RP1200- 17 ) is <br /> one example of a generally- recognized industry standard . <br /> E . Notification and Reporting <br /> 1 . The UST owner/operator must notify the local UST Program Unified Program Agency ( UPA) at least 48 <br /> hours prior to conducting secondary containment testing . (23 CCR §2637(g)) <br /> 2 . Results of secondary containment testing must be recorded on the Secondary Containment Testing <br /> Report Form located in Appendix VII of Title 23 California Code of Regulations . [The Unidocs document <br /> number is UN- 054.] [23 CCR §2637(e)] <br /> 3 . A voluntary- use Unidocs Secondary Containment Testing Report Form Supplement ( UW054A ) is also <br /> available to assist with requirements for documenting and reporting test data . <br /> 4 . Pass or fail , the UST owner/operator must submit a copy of the Secondary Containment Testing Report <br /> Form and required attachments to the local UPA within 30 days of completion of the test . [23 CCR §2637(f)] <br /> F . Record Keeping <br /> The UST owner/operator must maintain secondary containment testing records on -site, or off-site at a <br /> readily accessible location if approved by the local UPA , for at least 36 months . These records must be made <br /> available, upon request within 36 hours, to the local UPA or the State Water Resources Control Board . [23 CCR <br /> §2712(b) (1)(F)] <br /> G . Repairs and Retrofits <br /> 1 . The owner or operator of any UST system that cannot be tested in accordance with these requirements <br /> must replace the secondary containment with a system that can be tested . (23CCR §2637( b)) <br /> 2 . Check with the local UPA regarding plan check and permit requirements before repairing or retrofitting <br /> secondary containment . UPAS cannot approve a repair or upgrade unless it can be demonstrated that <br /> the UST system is structurally sound and the method of repair or upgrade will prevent unauthorized <br /> releases due to structural failure or corrosion during the operating life of the UST system . [23 CCR §2660(k) ] <br /> [Note : Piping pressure testing boots are not regulated components.] <br /> i <br /> i <br />
The URL can be used to link to this page
Your browser does not support the video tag.