My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2020
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
1469
>
2300 - Underground Storage Tank Program
>
PR0231126
>
COMPLIANCE INFO_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/30/2020 4:27:09 PM
Creation date
5/19/2020 2:59:02 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2020
RECORD_ID
PR0231126
PE
2361
FACILITY_ID
FA0001570
FACILITY_NAME
UNITED # 5447
STREET_NUMBER
1469
Direction
E
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95210
APN
08818030
CURRENT_STATUS
01
SITE_LOCATION
1469 E HAMMER LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
138
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UNDERGROUND STORAGE TANK <br /> MONITORING SYSTEM CERTIFICATION FORM <br /> VIII , MONITORING SYSTEM AND PROGRAMMING Y N NA <br /> This section must be completed if a monitoring panel is used to perform leak detection monitoring. ❑ ❑ ❑ <br /> Are the visual and audible alarms operational? [] ❑ ❑ <br /> Were all sensors visually inspected for kinks and breaks in the cables and for residual buildup to ensure that floats move freely, ❑ ❑ ❑ <br /> functional) tested , and confirmed o erational? <br /> Were all sensors installed at lowest point of secondary containment and positioned so that other equipment will not interfere with their ❑ ❑ ❑ <br /> ro er o eration? ❑ ❑ <br /> Was monitoring system set-up reviewed to ensure proper settings? <br /> Was the monitoring panel backup battery visually inspected , functionally tested , and confirmed operational? ❑ ❑ ❑ <br /> anser <br /> spe <br /> Does the flow of fuel stop at the dispenser if a leak is d n tcontainnmenhe 't monitoring system tem fails to operate or is electrically n ❑ <br /> secondary <br /> ❑ <br /> Does the turbine automatically shut down if the piping ry detects a leak? ❑ ❑ ❑ <br /> disconnected? <br /> Does the turbine automatically shut down if the piping secondary containment monitoring Undenrldispenser containment <br /> [] Sump ❑ ❑ ❑ <br /> Which sensors initiate positive shut down? (Check all that apply.) g erational? <br /> If alarms are relayed to a remote monitoring station , is all communications equipment (e . modem) op <br /> de <br /> Foran answer of "N" above, describe in section IX o and when <br /> rencies were or will be correcfed. <br /> alone type sensors and only remove power to dispenses . <br /> Dispenser Sensors are all stand All dispenser sensors passed <br /> JAN GAUGING GAUGING TESTING Y N NA <br /> on Check this box if tank gauging is used onm equipment is installed , (Don tcomplete ths section ction.) <br /> ❑ orin <br /> Check this box if NO tank gauging q pund ❑ ❑ ❑ <br /> This section must be com leted if in-tank au in is used to erform leak detection monitorin . or <br /> Has all input wiring been inspected for kinks and breaks in the cables and for proper entry and terfloats (move freely9funct ognallygtested , ❑ ❑ ❑ <br /> faults? <br /> Were all in-tank gauging probes visually inspected for damage and residue buildup to ensure that ❑ ❑ ❑ <br /> and confirmed operational? ❑ ❑ ❑ <br /> Was accuracy of system's product level readings tested ? El accuracy of system's water level readings tested? ❑ ❑ ❑ <br /> Were all probes reinstalled properly? ❑ ❑ <br /> Were all items on the equipment manufacturers maintenance checklist completed? <br /> Foran answer of "N" above, describe in section XI ho)(wl and w enOMMENTciencies were or will be corrected. <br /> Y = Yes, N = No, NA = Not Applicable <br />
The URL can be used to link to this page
Your browser does not support the video tag.