My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2020
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
3202
>
2300 - Underground Storage Tank Program
>
PR0231129
>
COMPLIANCE INFO_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/5/2021 2:12:42 PM
Creation date
5/19/2020 3:05:32 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2020
RECORD_ID
PR0231129
PE
2361
FACILITY_ID
FA0001817
FACILITY_NAME
7-ELEVEN INC #35355
STREET_NUMBER
3202
Direction
W
STREET_NAME
HAMMER
STREET_TYPE
Ln
City
Stockton
Zip
95209
CURRENT_STATUS
01
SITE_LOCATION
3202 W Hammer Ln
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
143
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Underground Storage Tank <br />Overfill Prevention Equipment Inspection Report <br />6. OVERFILL PREVENTION EQUIPMENT DETAILS <br />Tank ID (one OPE per column) <br />Are both vent and tank riser piping <br />secondarily contained? <br />OPE Model <br />What is the OPE response when activated? <br />(Check all that apply) <br />Are flow restrictors installed on vent piping <br />that may interfere with the OPE operation? <br />At what level in the tank is the OPE set to <br />activate? (Inches from bottom of tank) <br />What is the percent capacity of the tank at <br />which the OPE activates? <br />Is the OPE in proper operating condition to <br />respond when the stored substance reaches <br />the designated regulatory level? <br />T2: <br />Yes <br /> No <br />OPW <br />Shut off <br />Flow <br />Restricts <br />Flow <br />Audible <br />Alarm <br />Visual <br />Alarm <br /> Yes* <br /> No <br />107.25 <br />90 <br /> Yes <br /> No <br />T3:Diesel <br />Yes <br /> No <br />OPW <br />Shut off <br />Flow <br />Restricts <br />Flow <br />Audible <br />Alarm <br />Visual <br />Alarm <br /> Yes* <br /> No <br />101.50 <br />86 <br /> Yes <br /> No <br /> <br />Yes <br /> No <br />Shut off <br />Flow <br />Restricts <br />Flow <br />Audible <br />Alarm <br />Visual <br />Alarm <br /> Yes* <br /> No <br /> <br /> <br /> Yes <br /> No <br /> <br />Yes <br /> No <br />Shut off <br />Flow <br />Restricts <br />Flow <br />Audible <br />Alarm <br />Visual <br />Alarm <br /> Yes* <br /> No <br /> <br /> <br /> Yes <br /> No <br />7. SUMMARY OF TESTING RESULTS <br />OPE Inspection Results Pass <br /> Fail <br /> Pass <br /> Fail <br /> Pass <br /> Fail <br /> Pass <br /> Fail <br />8. COMMENTS <br />Describe all results marked "Fail" and each proposed remedy. <br />Couldn't remove nipple on 87dropt tube, not tested. <br />*Mark here if: <br /> Flow restrictors interfere with overfill prevention and equipment repairs required. <br />Additional copies of this page may be attached. <br />Attach tank chart(s), measurements, calculations, and In-Tank Setup report(s)
The URL can be used to link to this page
Your browser does not support the video tag.