My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2020
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
3202
>
2300 - Underground Storage Tank Program
>
PR0231129
>
COMPLIANCE INFO_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/5/2021 2:12:42 PM
Creation date
5/19/2020 3:05:32 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2020
RECORD_ID
PR0231129
PE
2361
FACILITY_ID
FA0001817
FACILITY_NAME
7-ELEVEN INC #35355
STREET_NUMBER
3202
Direction
W
STREET_NAME
HAMMER
STREET_TYPE
Ln
City
Stockton
Zip
95209
CURRENT_STATUS
01
SITE_LOCATION
3202 W Hammer Ln
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
143
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STEP 3: CUT THE UPPER DROP TUBE <br />Attach the supplied band clamp to the upper tube <br />just below the mark and ensure that it is assembled <br />square to the tube. The clamp can be used as a <br />guide for making a square cut. If a vise is used, <br />clamp on the valve body casting only to avoid <br />damage to the float and tubes (See Figure 3A). <br />Carefully saw through the tube squarely, at the mark <br />made in Step 2. Use a hacksaw with a new fine- <br />tooth blade. Rotating the upper tube as the sawing <br />progresses will minimize run out and ensure a <br />square 90-degree cut. Remove the band clamp <br />after tube is cut. <br /> <br />CAUTION -DO NOT use a pipe or tubing cutter to <br />cut the upper drop tube, this may damage the tube, <br />causing it to be out of round thereby prohibiting <br />assembly of the unit. <br /> <br />IMPORTANT: Remove all chips and shavings <br />generated in steps 3 thru 5 out of the cut end of the <br />tube. DO NOT remove chips and shavings by <br />dumping thru valve body. <br /> <br /> <br /> <br />Cut Line <br />Band Clamp <br /> Figure 3B <br /> <br />STEP 4: FILE THE UPPER DROP TUBE <br />File the upper tube square, and remove any burrs or <br />rough edges. Make sure the cut is flat and square. <br /> <br />IMPORTANT: Carefully file a good chamfer on the <br />inside edge of the drop tube to provide a lead-in for <br />the polypak seal and inlet tube installed in step 8. <br /> <br />Fine half round file <br /> Figure 3A <br /> Figure 4 <br /> <br /> 66
The URL can be used to link to this page
Your browser does not support the video tag.