My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2020
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MARCH
>
1206
>
2300 - Underground Storage Tank Program
>
PR0231175
>
COMPLIANCE INFO_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/4/2021 11:06:07 AM
Creation date
5/19/2020 3:15:36 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2020
RECORD_ID
PR0231175
PE
2361
FACILITY_ID
FA0001247
FACILITY_NAME
ARCO 07147
STREET_NUMBER
1206
Direction
E
STREET_NAME
MARCH
STREET_TYPE
LN
City
STOCKTON
Zip
95210
CURRENT_STATUS
01
SITE_LOCATION
1206 E MARCH LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
116
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Emergency Shut-Off (ESO) Testing 202013921 <br /> t=adltty tt• Arno 7147 Contractor: Gealer-Ryan I= <br /> Address: 1208 B March lane Address: 6B05 Sierra CG Sulia G <br /> City, Slate: Stockton. CA City, State: Dublin, CA 94568 <br /> Test Dale• 6118/2020 Technician: Darnell Smith <br /> The objective of this lest is to deme ea Iced assurance <br /> n da-energized untq isan the ESO switch activated, <br /> am re`sel ma ually� system circuits <br /> (turbines, and dispensers) are rg <br /> SW TC 1 2 3 4 6 <br /> Location of ESO On Building <br /> the speck) <br /> Type of Switch: PUSHJPULL <br /> Push Pull Momentary <br /> Plain light/Toggla Other <br /> Type of Turbine Control Relay System: Red .Jacket Standard Relay <br /> Power Integrity Custom Fab. Square D <br /> Power Solution Carolina Box Brown Box PiFORMANCt~ TEST <br /> Does the ESO shutdown power to the Y <br /> DISPENSERS? (Y/N) <br /> Dass the ESO shutdown power to the Y <br /> TURBINES? (YIN) <br /> PASS <br /> LOVWEARALLESULT (Pass or Fall) <br /> If the test falls and cannot be fixed while onsite, call the Help Desk & document the ticket number <br /> tf the test fails, contractor MUST: place an "Deaf hof loervice tag on cate circuit panef�cead identify turbine afy the ite manager and teach nd dispenser breakers fo�hut- <br /> alternative emergency shut down procedures (i.e.. <br /> off In the event of an emergency) <br />
The URL can be used to link to this page
Your browser does not support the video tag.