My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2020
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MARCH
>
1206
>
2300 - Underground Storage Tank Program
>
PR0231175
>
COMPLIANCE INFO_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/4/2021 11:06:07 AM
Creation date
5/19/2020 3:15:36 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2020
RECORD_ID
PR0231175
PE
2361
FACILITY_ID
FA0001247
FACILITY_NAME
ARCO 07147
STREET_NUMBER
1206
Direction
E
STREET_NAME
MARCH
STREET_TYPE
LN
City
STOCKTON
Zip
95210
CURRENT_STATUS
01
SITE_LOCATION
1206 E MARCH LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
116
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
From: Martinez, Genesis [EHD] <gmartinez@sigov.org> <br /> Sent:Thursday, December 17, 2020 9:43 AM <br /> To: Robert Velasco<roberty@asengineer.com>; Nso, Paul [EHD] <pnso@sigov.org> <br /> Cc: EH-UST<ust@sigov.org> <br /> Subject: RE: BP/Arco - 1206 East March Lane, Stockton CA 95210 <br /> Hi Robert, <br /> Thank you for the email. I will give it to the area inspector. <br /> Please note our email address has changed to ust@sigoy.org <br /> G�Mm+,t .erz I Office Assistant <br /> San Joaquin County Environmental Health Department <br /> 1868 E. Hazelton Ave. Stockton, CA 95205 <br /> M (209)468-02178 (209) 468-34331�,< gmartinez@sigov.org <br /> EHD Website: https://www.sigov.org/department/envhealth/ <br /> From: Robert Velasco<roberty@asengineer.com> <br /> Sent:Thursday, December 17, 2020 9:41 AM <br /> To: Nso, Paul [EHD] <pnso@sigov.org> <br /> Cc: Martinez, Genesis [EHD] <gmartinez@sigov.org>; EH-UST<ust@sigov.org> <br /> Subject: BP/Arco - 1206 East March Lane, Stockton CA 95210 <br /> CAUTION:This email is originated from outside of the organization. Do not click links or open attachments unless you recognize the <br /> sender and know the content is safe. <br /> Good morning Paul, <br /> Below please find scope of work needed to be completed for existing fuel dispensers 7/8 &9/10 for the subject facility; <br /> • Remove existing conduits, patch existing electrical penetration within the existing fiberglass udc <br /> • Install 2 new, W penetration fittings <br /> • Conduct an SB989 test <br /> Please see photos below as well. Attached please also find the electrical plans showing replacement of damaged <br /> electrical conduits for existing fuel dispensers 7/8 &9/10 that have already been reviewed/approved by City of <br /> Stockton. Please advise if permit/approval/inspection from your office is required for this project. <br /> Thank you &greatly appreciate all assistance from your office with expediting this project as much as possible, facility is <br /> under construction. <br /> Sincerely, <br /> Robert Velasco <br /> A & S Engineering <br /> 28405 Sand Canyon Road, Suite "8" <br /> 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.