Laserfiche WebLink
20201085 <br /> UNDERGROUND STORAGE TANK <br /> SECONDARY CONTAINMENT TESTING REPORT FORM (Page 1 of 6) <br /> Type of Action ❑ Installation Test ❑ Repair Test EI Six Month Test 2136 Month Test <br /> I. FACILITY INFORMATION <br /> CERS ID Date of Secondary Containment Test <br /> 10180733 4113/2020 <br /> Business Name (Same as Facility Name or DBA-Doing Business As) <br /> Arco 7147 <br /> Business Site Address City ZIP Code <br /> 1206 E March Lane Stockton 95210 <br /> II. UNDERGROUND STORAGE TANK SERVICE TECHNICIAN INFORMATION <br /> Name of UST Service Technician Performing the Test (Print as shown on the ICC Certification) Phone # <br /> Bodo Sanchez (925) 551 -7555 <br /> Contractor I Tank Tester Ucense # ICC Certification # ICC Certification Expiration Date <br /> 220793 8887127 6/4/2020 <br /> III. SUMMARY OF SECONDARY CONTAINMENT TESTING RESULTS <br /> TANK ID: (By tank number, stored product, etc.) A 87 B 91 C DSL D <br /> Tank Containment <br /> Tightness Test Result M Pass ❑ Fail ❑ NA O Pass ❑ Faii ❑ NA I@ Pass ❑ Fail ❑ NA p Pass ❑ Fail O NA <br /> Product Piping Containment <br /> Tightness Test Result IO Pass ❑ Fall ❑ NA M Pass ❑ Fall ❑ NA O Pass ❑ Fail ❑ NA ❑ Pass O Fall ❑ NA <br /> Communication Test Result ❑ Pass ❑ Fall M NA Q Pass ❑ Fall M NA ❑ Pass Cl Fall S NA ❑ Pass ❑ Fail ❑ NA <br /> Remote Fill Piping Containment <br /> Tightness Test Result ❑ Pass ❑ Fail I@ NA ❑ Pass ❑ Fall M NA ❑ Pass ❑ Fall M NA ❑ Pass ❑ Fail ❑ NA <br /> j Communication Test Result ❑ Pass ❑ Fail M NA ❑ Pass ❑ Fail p NA ❑ Pass ❑ Fail 121 NA ❑ Pass ❑ Fall D NA <br /> Vent Piping Containment <br /> r Tightness Test Result D Pass ❑ Fail O NA ❑ Pass ❑ Fail p NA ❑ Pass ❑ Fall p NA ❑ Pass Q Fall ❑ NA <br /> t <br /> Communication Test Result D Pass ❑ Fall CI NA [3 Pass ❑ Fail p NA [3 Pass ❑ Fall O NA C3 Pass [3 Fall ❑ NA <br /> Vapor Recovery Piping Containment <br /> Tightness Test Result ❑ Pass ❑ Fall p NA ❑ Pass ❑ Fail A NA ❑ Pass ❑ Fall M NA ❑ Pass ❑ Fail ❑ NA <br /> Communication Test Result ❑ Pass ❑ Fall p NA ❑ Pass ❑ Fall Gi NA CI Pass ❑ Fail O NA ❑ Pass ❑ Fail ❑ NA <br /> Turbine I Product Piping Sump <br /> Tightness Test Result El Pass ❑ Fall ❑ NA O Pass ❑ Fail ❑ NA p Pass ❑ Fail ❑ NA ❑ Pass ❑ Fail ❑ NA <br /> Fill Riser Sump <br /> Tightness Test Result ❑ Pass ❑ Fall Q NA ❑ Pass ❑ Fall El NA ❑ Pass ❑ Fall O NA ❑ Pass ❑ Fail ❑ NA <br /> VENT I TRANSITION SUMP ID: a b C d <br /> Tightness Test Result ❑ Pass ❑ Fall ❑ NA ❑ Pass ❑ Fall ❑ NA ❑ Pass ❑ Fail ❑ NA ❑ Pass ❑ Fall ❑ NA <br /> UDC ID: 1 2 3 4 <br /> Tightness Test Result M Pass ❑ Fail ❑ NA M Pass ❑ Fall ❑ NA M Pass ❑ Fall ❑ NA El Pass ❑ Fall ❑ NA <br /> UDC ID: 5 6 7 8 <br /> Tightness Test Result p Pass ❑ Fall ❑ NA O Pass ❑ Fall ❑ NA ❑ Pass ❑ Fall ❑ NA ❑ Pass ❑ Fall ❑ NA <br /> UDC ID: 9 10 11 12 <br /> Tightness Test Result [3Pass [3 Fall [3 NAA <br /> ❑ Pass ❑ Fail ❑ NA ❑ Pass ❑ Fall ❑ NA ❑ Pass ❑ Fall ❑ NA <br /> All ifems marked "Faii" or "NA " must be explalned in their respective "COMMENTS" section. <br /> iV. CERTIFICATION BY UST SERVICE TECHNICIAN CONDUCTING THIS TESTING <br /> I hereby certify that the secondary containment was tested I ccordance with California Codp o Regula}ionsjItle 23, Division <br /> 3 Chapter 16, Section 2637 and all the Info tion contal hereIrWs accurate. <br /> UST Service Technician Signature <br /> tr <br /> CERS = Caftria Erukonmemal Reporting System, ID = IderrtifCation, UST = Underground Storage Tank, ICG = IntematiorW Code Counct, NA NotAppfcable = Under. <br />