Laserfiche WebLink
UNDERGROUND STORAGE TANK <br /> MONITORING SYSTEM CERTIFICATION FORM (Page 6 of 6) <br /> XVI . MONITORING SITE PLAN <br /> Date site map was prepared : $/ 19/2020 <br /> If you already have a site plan that shows all required information, you may include it, rather than this page, with your Monitoring System <br /> Certification Form. The site plan must show the general layout of tanks and piping and clearly identify locations of the following equipment, <br /> if installed: 1) monitoring system control panels; 2) in-tank liquid level probes (if used for leak detection); 3) devices monitoring tank <br /> annular spaces or vault; 4) devices monitoring product piping; 5) devices monitoring fill piping; 6) devices monitoring vent piping; 7) devices <br /> monitoring vapor recovery piping; 8) devices monitoring vent/transition sumps; 9) devices monitoring under-dispenser containment; 10) <br /> line leak detectors; and 11) devices monitoring any other secondary containment areas. <br /> Site Address: Pacific Service Statim 6131 PACIFIC AVENUE STOCKTON CA 95207 <br /> . . . . . . . . . . . . . . . . . _ . . <br /> tPIPLN G } <br /> . _ . 0 . _ . I I . . . . - . _ . . . . I I I I . _ . . . . . . _ ( ILRROWS) <br /> . . . . . . . . S . . S . . . . . . . _ 1 . - • Drataineof <br /> _ - I I I I I pipinx etdt of <br /> sump and UDC's. <br /> C C No undarEround <br /> drawing is <br /> _ accurate, UV <br /> cannotspecnlate <br /> . . . . . blue prints <br /> 87 <br /> O T <br /> L - <br /> 0 T <br /> L <br /> . . . . . . . ww 11 - DIE O <br /> >KEs I I I m 0 1 M 4 <br /> O <br /> A = A74tYULARSemor - _ . . . . . _ . . _ _ - I <br /> F = FMLS - - - - . . . . . . - <br /> V = VAPOR <br /> P = PROBE x <br /> L = Turbine I Leak Defector . . . . <br /> X = SUMP SENSOR <br /> B = Brine Sensor <br /> S = Smart Sensor <br /> G =Float` .4 Chamx cas <br /> E = E Stop <br /> PACIFIC 3CFS"[lE <br /> dt\v items undargrourdthat ara not virible to the certi6-ing teeknfcimt ara a <br /> prgfsssiond op inian onbl and are rolat,%forLbatr»tgo <br /> not to ccard <br /> Date map was drawn: $119120 <br /> Instructions <br /> If you already have a diagram that shows all required information, you may include it, rather than this page, with your fJonitoring System Certification. On your site plan, <br /> show the general layoutof tanksandpiping. Cleady 3entify locations of the following equipment, if Installed: monlorsg system control panels; sensors monitorin-i tank <br /> annular spaces, sumps , dispenser pans, spill containers , or other secondary containment areas; mechanical or electronic line leak detectors; and in-tank liquid level <br /> probes (d used for leak deteetrmn). In the spate provided, note the date this Site Plan was prepared. <br /> LEGEND <br />