Laserfiche WebLink
}£ ' 7 <br /> S D <br /> / y <br /> F. In-Tank Gauging 1 SIR Equipment: ® Check this box if tank gauging is used only for inventory con�rid I l j <br /> ❑ Check this box if no tank gauging or SIR equipment is installed . <br /> This section must be completed if in-tank gauging equipment is used to perform leak detection monitoring . g ,, f R <br /> � 1 <br /> Complete the following checklist: t j 8 ` 1 iEAL rid <br /> ® Yes ❑ No* Has all input wiring been inspected for proper entry and termination , including testing for ground faults? <br /> ® Yes ❑ No* Were all tank gauging probes visually inspected for damage and residue buildup? <br /> ® Yes ❑ No* Was accuracy of system product level readings tested? <br /> ® Yes ❑ No* Was accuracy of system water level readings tested? <br /> ® Yes ❑ No* Were all probes reinstalled properly? <br /> ® Yes ❑ No* Were all items on the equipment manufacturers maintenance checklist completed? <br /> * In Section H, below, describe how and when these deficiencies were or will be corrected. <br /> Line Leak Detectors (LLD): ❑ Check this box if LLDs are not installed . <br /> Complete the following checklist: <br /> ® Yes ❑ No* For equipment start-up or annual equipment certification, was a leak simulated to verify LLD performance? (Check all that apply) <br /> ❑ N/A Simulated leak rate: ® 3 g .p. h . ; ❑ 0. 1 g . p. h ; ❑ 0.2 g . p. h . <br /> ® Yes ❑ No* Were all LLDs confirmed operational and accurate within regulatory requirements? <br /> ® Yes ❑ No* Was the testing apparatus properly calibrated? <br /> ❑ Yes ❑ No* For mechanical LLDs, does the LLD restrict product flow if it detects a leak? <br /> ® N/A <br /> ® Yes ❑ No* For electronic LLDs, does the turbine automatically shut off if the LLD detects a leak? <br /> ❑ N/A <br /> ® Yes ❑ No* For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system is disabled or disconnected? <br /> ❑ N/A <br /> ® Yes ❑ No* For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system malfunctions or fails a test? <br /> ❑ N/A <br /> ® Yes ❑ No* For electronic LLDs, have all accessible wiring connections been visually inspected? <br /> ❑ N/A <br /> ® Yes ❑ No* Were all items on the equipment manufacturers maintenance checklist completed ? <br /> * In Section H, below, describe how and when these deficiencies were or will be corrected . <br /> H . Comments : <br /> Monitoring System Certification Page 3 of 4 2/21 /07 <br />