Laserfiche WebLink
20 February 2003 <br /> AGE-NC Project No 97-0290 <br /> Page 6 of 6 <br /> I0 Replacement of the SVE carbon vessels and continued monthly operation and r,ionitormg of <br /> the IAS and SVE operation <br /> I0 Continued quarterly groundwater monitoring,the next monitoring event should be scheduled <br /> for April 2003 <br /> 6.0. LIMITATIONS <br /> IOur piofessional services were performed using that degree of care and skill ordinarily exercised by <br /> environmental consultants practicing in this or similar localities The findings were based upon <br /> analytical results provided by an independent laboiatory Evaluation oftht subsurface conditions at <br /> the site for the purpose of this investigation was made from review of a limited number of available <br /> data points (soil vapor and ground water samples) and subsurface conditions may vary away from <br /> Ithese data points No other warranty, expressed or implied, is made as to the professional <br /> interpretations, opinions and recommendations contained in this report <br /> r• <br /> i <br /> i <br /> i <br /> i <br /> i <br /> Advanced GeoEnvironmental,Inc <br /> I <br />