Laserfiche WebLink
• TABLE OF CONTENTS <br /> Page <br /> 10 INTRODUCTION 1 <br /> 20 BACKGROUN 1 <br /> 30 SCOPE OF WORK 3 <br /> 31 PERMITTING, PLANNING AND PRE-FIELD WORK ACTIVITIES 4 <br /> 32 INSTALLATION OF REMEDIATION WELLS 4 <br /> 33 INSTALLATION OF SOIL VAPOR EXTRACTION/ <br /> AIR SPARGE PIPING SYSTEM 4 <br /> 34 SOIL VAPOR EXTRACTION SYSTEM START-UP PERIOD 4 <br /> 35 MONITORING AND MAINTENANCE ACTIVITIES 4 <br /> 36 PROGRESS/CONFIRMATION SAMPLING 5 <br /> 40 PROCEDURES 6 <br /> 41 DRILLING ACTIVITIES 6 <br /> 42 SOIL VAPOR EXTRACTION SYSTEM DESIGN 6 <br /> 4 2 1 Soil Vapor Extraction Well Installation 7 <br /> 4 2 2 Soil Vapor Extraction Piping System 7 <br />• 4 2 3 Soil Vapor Extraction Supplemental Fuel 8 <br /> 4 2 4 Soil Vapor Extraction Monitoring Activities 8 <br /> 43 IN-SITU AIR SPARGING SYSTEM DESIGN 8 <br /> 4 3 1 In-situ Air Sparging Well Installation 8 <br /> 4 3 2 In-situ Air Sparging Piping System 9 <br /> 4 3 3 In-situ Air Sparging Monitoring Activities 9 <br /> 44 PERMITTING 10 <br /> 45 SOIL VAPOR EXTRACTION/IN-SITU AIR SPARGING <br /> SYSTEM MAINTENANCE 10 <br /> 46 PROGRESS/CONFIRMATION SOIL SAMPLING 10 <br /> FIGURES <br /> Figure 1 -Location Map <br /> Figure 2 - Site Plan <br /> Figure 3 -Remediation Well Locations <br /> Figure 4 - Soil Vapor Extraction Well Design <br /> Figure 5 -Aar Sparging Well Design <br /> APPENDICIES <br /> Appendix A - SVE System Description <br /> Advanced GeoEnviron mental,Inc <br />