Laserfiche WebLink
1 <br /> I <br /> 31 August 1999 <br />' AGE-NC Project No 97-0290 <br /> Page 6 of 6 <br />' Corrective Action Plan (CAP), dated 10 June 1999 and results of the July 1999 extraction <br /> test, in-situ air sparging with soil vapor extraction appear to be the most efficient and cost <br />' effective options for site remediation <br /> • The next quarterly ground water monitoring event should be scheduled for October 1999 <br /> 6.0. LIMITATIONS <br />' Our professional services were performed using that degree of care and skill ordinarily exercised by <br /> environmental consultants practicing in this or similar localities The findings were based upon <br />' analytical results provided by an independent laboratory Evaluation of the geologic conditions at <br /> the site for the purpose of this investigation was made from review of documents provided by the <br /> client to AGE, and a limited number of available data points (soil and ground water samples) and <br />' subsurface conditions may vary away from these data points No other warranty, expressed or <br /> implied, is made as to the professional recommendations contained in this report <br /> r• <br /> r <br /> r <br /> r <br /> r <br /> r <br /> r <br /> r <br /> • <br /> r <br /> Advanced GeoEmironmental,int <br />