My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0008316
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
S
>
SCHOOL
>
107
>
3500 - Local Oversight Program
>
PR0545674
>
ARCHIVED REPORTS_XR0008316
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/20/2020 10:15:38 AM
Creation date
5/20/2020 10:02:47 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0008316
RECORD_ID
PR0545674
PE
3528
FACILITY_ID
FA0006039
FACILITY_NAME
MARK NEWFIELD
STREET_NUMBER
107
Direction
N
STREET_NAME
SCHOOL
STREET_TYPE
ST
City
LODI
Zip
95240
CURRENT_STATUS
02
SITE_LOCATION
107 N SCHOOL ST
P_DISTRICT
004
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
66
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I TABLE OF CONTENTS (CONT.) <br />' <br /> 73 IN-SITU BIOREMEDIATION 13 <br /> 73 1 Principles 14 <br /> 732 Nutrient Requirements and Toxicity 14 <br /> 73 3 Inoculation Wells 14 <br /> 734 Monitoring Activities 15 <br /> 7 3 5 Duration 15 <br />' 7 3 6 Feasibility 15 <br /> 7 3 7 Estimated Cost For In-Situ Bioremediation 15 <br /> 74 NATURAL ATTENUATION 16 <br />' 7 4 1 Principles 16 <br /> 7 4 2 Duration 16 <br /> 743 Feasibility 16 <br /> 744 Estimated Costs 17 <br />' 8 0 GROUND WATER REMEDIATION ALTERNATIVES 17 <br /> 8 1 IN-SITU AIR SPARGING 17 <br /> 811 Principles 17 <br />' 8 1 2 Basic System Design 18 <br /> 8 1 3 Monitoring Activities 18 <br /> 814 Feasibility 18 <br /> lie 8 1 5 Duration 19 <br /> 8 16 Cost 19 <br /> 82 GROUND WATER EXTRACTION 20 <br /> 82 1 Basic Principles . 20 <br /> 8 2 2 Treatment Methods 20 <br /> 8 2 3 Feasibility Studies 20 <br /> 8 2 4 Duration 21 <br /> 825 Cost 21 <br /> 83 IN-SITU BIORFMEDIATION/BIOENHANCEMENT 21 <br /> 83 1 Basic Principles 21 <br /> 8 3 2 Nutrient Requirements And Toxicity 22 <br /> 83 3 Monitoring Activities 22 <br /> 8 3 4 Feasibility Studies 22 <br /> 8 3 5 Duration 22 <br /> 8 3 6 Cost 23 <br /> 84 NATURAL ATTENUATION 23 <br /> 8 4 1 Principles 23 <br /> 8 4 2 Duration 23 <br /> 843 Feasibility 24 <br />' 844 Estimated Costs 24 <br />
The URL can be used to link to this page
Your browser does not support the video tag.