My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
S
>
SIXTH
>
11
>
2900 - Site Mitigation Program
>
PR0523598
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/20/2020 11:05:11 AM
Creation date
5/20/2020 10:03:29 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0523598
PE
2960
FACILITY_ID
FA0015928
FACILITY_NAME
TAOC 6TH ST TRACY RAILYARD (BOWTIE)
STREET_NUMBER
11
Direction
W
STREET_NAME
SIXTH
STREET_TYPE
ST
City
TRACY
Zip
95376
APN
23515016
CURRENT_STATUS
01
SITE_LOCATION
11 W SIXTH ST
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
365
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
California r 3ional Water Quality Cor of Board , E,,°..NE <br /> Central Valley Region W' ° <br /> Katherine Hart, Chair <br /> P. 1685 E Street, Fresno. California 93706 <br /> R <br /> Linda S.Adams `> r (559)445-5116 • FAX(559)445-5910 Edmund G.Brown Jr. <br /> VActing Secretary for .waterboards.ca.gov/centra Iva Hey Governor <br /> Environmental Protection AUG <br /> ® � Zell <br /> 8NViRON <br /> 29 July 2011 pEAM sEg ��CTy <br /> V/% <br /> Lee Higgins <br /> Chevron Environmental Management Company <br /> 6001 Bollinger Canyon Road <br /> P. O. Box 6012 <br /> San Ramon, CA 94583 <br /> REVIEW— SOIL AND GROUNDWATER INVESTIGATION WORKPLAN, TRACY RAIL YARD <br /> OFFSITE - SOUTH AREA, TRACY, SAN JOAQUIN COUNTY <br /> Chevron Environmental Management Company (Chevron) submitted a Workplan for a Soil <br /> and Groundwater Investigation (Workplan) dated 12 Jply 2011, for the Tracy Rail Yard Offsite <br /> - South Area (Site). The Workplan was prepared on behalf of Chevron by AMEC Geomatrix, <br /> Inc. (AMEC). <br /> The project is adjacent to the south, generally upgradient of the Tidewater Associated Oil <br /> Company (TAOC) 6th Street Tracy Rail Yard (TRY) project site, in central Tracy. The Site <br /> consists of some undeveloped parcels adjacent the west side of TAOC 6th Street project, but <br /> primarily is within an area of single family residential development to the south. <br /> As a result of investigations in 2005 associated with the TAOC 6th Street TRY project, <br /> impacted soil and groundwater was identified at/near the southern project boundary. The <br /> upgradient extent of impacts was not delineated on the southern part of the TRY onsite <br /> project. Additional characterization is needed within the adjacent residential neighborhood to <br /> evaluate the extent of affected soil/groundwater upgradient of the TRY project area. The <br /> Workplan proposes drilling ten soil borings (South 1 to South 10) within the City of Tracy <br /> residential streets to collect soil and groundwater samples for analysis of the petroleum <br /> hydrocarbon chemicals of potential concern. Additional borings will be added if further soil <br /> and/or groundwater sampling is needed. <br /> According to AMEC's Workplan: <br /> • Offset borings — South 1 will be drilled on the undeveloped land parcels adjacent to the <br /> south part of TRY project; South 2, 3, and 4 will be drilled in 4th Street, along the north <br /> side of the private residences. It is anticipated that borings will be completed to <br /> approximately 25 feet below ground surface (bgs). Soil/groundwater samples will be <br /> collected for analysis. <br /> California Environmental Protection Agency <br /> 0a Recycled Paper <br />
The URL can be used to link to this page
Your browser does not support the video tag.