My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
S
>
SIXTH
>
11
>
2900 - Site Mitigation Program
>
PR0523598
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/20/2020 11:05:11 AM
Creation date
5/20/2020 10:03:29 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0523598
PE
2960
FACILITY_ID
FA0015928
FACILITY_NAME
TAOC 6TH ST TRACY RAILYARD (BOWTIE)
STREET_NUMBER
11
Direction
W
STREET_NAME
SIXTH
STREET_TYPE
ST
City
TRACY
Zip
95376
APN
23515016
CURRENT_STATUS
01
SITE_LOCATION
11 W SIXTH ST
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
365
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
amec- , <br /> Mr. Dean Hubbard <br /> Regional Water Quality Control Board <br /> February 15, 2011 <br /> Page 4 <br /> REPORT <br /> After analytical results have been received and evaluated, an addendum to the Investigation <br /> Report will be prepared to transmit the results. <br /> SCHEDULE <br /> It is anticipated that investigation activities can commence within 3 weeks of receipt of approval <br /> of this work plan addendum from the Water Board, depending on contractor availability. <br /> Analytical results will be received within 1 week of completion of investigation activities. A report <br /> will be submitted to the Water Board within 6 weeks of receiving analytical results. <br /> Please call either of the undersigned if you have any questions or require any additional <br /> information. <br /> Sincerely yours, <br /> AMEC Geomatrix, Inc. <br /> Jennifer L. Patterson, PE #59161 Gary R. Foote, PG #5044 <br /> Senior Engineer Principal Geologist <br /> jlp/grf/gmb/bfw <br /> X:\14000s\14143.000\4000Wddt'IWP 021511\1 text\Text.docx <br /> Attachments: Figure 1 —Site Location Map <br /> Figure 2 —Site Plan <br /> Figure 3 —Soil Sample Analytical Data —Vicinity of TRY-1 (OU-2) <br /> Figure 4 — Proposed Groundwater Sample Locations — East Area (OU-2) <br /> Figure 5 — Proposed Groundwater Sample Locations —West Area (OU-5) <br /> cc: Tami Trearse, Department of Toxic and Substance Control <br /> James Diel, Union Pacific Rail Road <br /> Scott Davis, ARCADIS <br /> Lee Higgins, Chevrom Environmental Management Company <br />
The URL can be used to link to this page
Your browser does not support the video tag.