My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0008327
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
S
>
SCHOOL
>
107
>
3500 - Local Oversight Program
>
PR0545674
>
ARCHIVED REPORTS_XR0008327
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/20/2020 10:09:48 AM
Creation date
5/20/2020 10:04:52 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0008327
RECORD_ID
PR0545674
PE
3528
FACILITY_ID
FA0006039
FACILITY_NAME
MARK NEWFIELD
STREET_NUMBER
107
Direction
N
STREET_NAME
SCHOOL
STREET_TYPE
ST
City
LODI
Zip
95240
CURRENT_STATUS
02
SITE_LOCATION
107 N SCHOOL ST
P_DISTRICT
004
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• 21 September 1998 <br /> AGE-NC Project No 97-0290 <br /> Page 7of8 <br /> Califomxa-licensed surveyor <br /> 3 7 WELL DEVELOPMENT <br /> Development will consist of a combination of bailing to remove the major portion of fine-grained <br /> sediment from inside the well, surging to flush out or draw in sediment from the filter pack, and <br /> additional bailing to finish the removal of sediment Development activities will be continued until <br /> field parameter(pH, electrical conductivity, and temperature) readings have stabilized or produced <br /> water appears to be sediment-free <br /> 3 8 GROUNDWATER SAMPLING PROCEDURES <br /> Groundwater sample collection will be performed in accordance with pertinent applicable sampling <br /> protocols, details of which are presented below <br />. 3 8 1 Static Water Level Measurements <br /> Before sampling and during quarterly groundwater monitoring, static water level will be measured <br /> using an electric water level indicator Water level data will be recorded to the nearest 0 01 foot <br /> from a reference point marked of the top of the PVC well casing Before and after each use, the <br /> measurement device will be rinsed with water <br /> 3 8 2 Well Evacuation <br /> Subsequent to measurement of depth to water and prior to sampling, the well will be purged using <br /> a disposable bailer or submersible pump to ensure that the sample is representative of the formation, <br /> rather than water standing in the well casing The well will be purged until a minimum of three <br /> casing volumes is removed from the well, and the field-measured ground water parameters have <br /> stabilized, or the well is purged dry If a well is purged dry prior to evacuating three casing volumes, <br /> a ground water sample will be collected following 80 percent recovery of ground water within the <br /> well or within 8-hours of well evacuation <br /> 3 8 3 Sample Withdrawal <br /> Water samples will be collected from the monitoring well using a disposable polyethylene bailer <br /> .advanced GeoEnvironmental,Inc <br />
The URL can be used to link to this page
Your browser does not support the video tag.