Laserfiche WebLink
i <br /> BILE UPT <br /> . ENVIRONMENTAL HEALTH DEPARTMENT <br /> ,o. <br /> SAN JOAQUIN COUNTY <br /> Unit Supervisors <br /> Donna K.Heran R.E.H.S. <br /> ' 304 East Weber Avenue, Third Floor Carl Borgman,R.E.H.S. <br /> Director Mike Huggins,R.C.I LS.,R.D.I. <br /> Al Olsen,R.0 H S Stockton, California 95202-2708 Douglas W.Wilson,Ii.S. <br /> •'cp:• Pro rain Manager <br /> 4 .........a•gi � � Telephone: (209)468-3420. Margaret Lagorio,R.1_.11.S.: <br /> �rFoa Laurie A.Cotulla,R.E.H.S. Robert McClellon,R.C.H.S. <br /> Program Manager_ Fax: (209) 464-0138 Mark 13arcellos,R.C.FLS. <br /> a j <br /> SONYA OLBRANTZ <br /> PREMDOR US HOLDINGS INC" <br /> 2675 KINGS GAP MTN RD <br /> PIEDMONT AL 36272 <br /> RE: Prcmdor <br /> 433 W.Scotts Ave. <br /> Stockton,C.1 <br /> WORKPLAN: Additional Site Assessment and Monitoring Well Installation DATED:04/15/03 <br /> PREPARED BY: Advanced GeoEnvironmental,Inc. <br /> APPROVED X <br /> DISAPPROVED D <br /> ADDENDUM 0 Submit by: <br /> ADEQUATE_AND NECESSARY ELEMENTS OF THE WORILPLAN [Health&Safcty Code (1-I&S) <br /> Section 25299.37(c)(3)]: <br /> 1. Installation of three monitoring wells,a deep soil boring and collection of soil samples and a water <br /> samples. <br /> 2. Laboratory analysis of soil and water samples for total petroleum hydrocarbons(TPI-f) as gasoline,TPH as <br /> diesel,BTEK,1,2-DCA,EDB and lead using appropriate EPA methods. <br /> 3. Preparation of a report that details the work performed. <br /> COMMENTS AND CONDITIONS: <br /> 1. Submit an Environmental Health Department(EHD)well permitappication and$89 permit fee. <br /> Once the well permit has been approved,notify EHD of the proposed schedule for the work. <br /> 2. Laboratory analysis for MTBE,TBA,ETRE,TAME,and DIPE are not required on soil samples. <br /> Groundwater samples from the monitoring wells must be analyzed for these compounds for two <br /> consecutive water sampling events. If the results are non-detect at appropriate detection limits,then <br /> further analysis for these compounds can be discontinued. <br /> 3. Work should be completed by Jtine 18,2003. <br /> i <br /> REASONS FOR DISAPPROVAL OF THE WORKPLAN (H&S Section 25299.37(c)(3)): <br /> DATED 1 bL,25D 3 BY , <br /> { <br /> Cc: CVRWQCB—Jim Barton <br /> Advanced GeoEnvironmental—Dan Kalmbach <br /> I <br /> i <br /> i <br /> If <br />