My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
S
>
SCOTTS
>
433
>
3500 - Local Oversight Program
>
PR0545678
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/20/2020 11:30:13 AM
Creation date
5/20/2020 11:21:55 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0545678
PE
3528
FACILITY_ID
FA0005843
FACILITY_NAME
MASONITE CORPORATION
STREET_NUMBER
433
Direction
W
STREET_NAME
SCOTTS
STREET_TYPE
AVE
City
STOCKTON
Zip
95203
APN
14704044
CURRENT_STATUS
02
SITE_LOCATION
433 W SCOTTS AVE
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
71
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> I <br /> Premdor Corporation =2 <br /> investigative workplan/Corrective Action Plan (CAP)before performing any work.:This phasing process <br /> and the workplan/CAP requirements were intended to: <br /> 1. help the responsible party undertake the necessary,corrective action in a cost-effective, efficient and <br /> timely manner; <br /> 2. enable the regulatoryagency to review and approve the proposed cost-effective corrective action <br /> alternative before any corrective action work was performed; and <br /> 3. ensure the Fund will only reimburse the most cost-effective corrective action alternative required by <br /> the regulatory agency to achieve the minimum cleanup necessary to protect human health, safety and <br /> the.environment. <br /> In some limited situations interim cleanup will be necessary to mitigate a demonstrated immediate <br /> hazard to public health, or the environment. Program regulations allow the responsible party to undertake <br /> interim remedial action after: (1)notifying the regulatory agency of the proposedaction, and; (2) <br /> complying with any requirements that the`regulatory agency may set. Interim remedial action should only <br /> be proposed when necessary to mitigate an immediate demonstrated hazard.Implementing interim <br /> remedial action does not eliminate the requirement for a CAP and'an evaluation.of the most cost- <br /> effective corrective action alternative. <br /> Three bids and Cost Preapproval: Only corrective action costs required by the regulatory agency to <br /> protect human health, safety and the environment can be claimed for reimbursement. You must comply j <br /> with all regulatory agency time schedules and requirements and you must obtain three bids for any <br /> required corrective action. Unless waived in writing,you are required to obtain preapproval of costs for <br /> all future corrective action work. If you do not obtain three bids or a waiver of the three bid <br /> requirement, reimbursement is not assured and costs may be rejected as ineligible. . <br /> If you have any questions,please contact me at(916)341-5761. <br /> Sincerely, <br /> i <br /> Barbara Rempel <br /> Claims Review Unit <br /> Underground Storage Tank Cleanup Fund <br /> i <br /> cc: Mr. Gordon Boggs /Ms.Margaret La orio <br /> g g <br /> RWQCB,Reg. 5 -Sacramento San Joaquin County EHD <br /> 3443 Routier RoadP.O.Box 2009 <br /> Sacramento, CA 95827-3098 Stockton,CA 95201 <br /> - I <br /> I <br /> California EBviroBmentsIProtecdoR Agency <br /> RecycledPaper <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.