Laserfiche WebLink
i <br /> I <br /> Premdor Corporation =2 <br /> investigative workplan/Corrective Action Plan (CAP)before performing any work.:This phasing process <br /> and the workplan/CAP requirements were intended to: <br /> 1. help the responsible party undertake the necessary,corrective action in a cost-effective, efficient and <br /> timely manner; <br /> 2. enable the regulatoryagency to review and approve the proposed cost-effective corrective action <br /> alternative before any corrective action work was performed; and <br /> 3. ensure the Fund will only reimburse the most cost-effective corrective action alternative required by <br /> the regulatory agency to achieve the minimum cleanup necessary to protect human health, safety and <br /> the.environment. <br /> In some limited situations interim cleanup will be necessary to mitigate a demonstrated immediate <br /> hazard to public health, or the environment. Program regulations allow the responsible party to undertake <br /> interim remedial action after: (1)notifying the regulatory agency of the proposedaction, and; (2) <br /> complying with any requirements that the`regulatory agency may set. Interim remedial action should only <br /> be proposed when necessary to mitigate an immediate demonstrated hazard.Implementing interim <br /> remedial action does not eliminate the requirement for a CAP and'an evaluation.of the most cost- <br /> effective corrective action alternative. <br /> Three bids and Cost Preapproval: Only corrective action costs required by the regulatory agency to <br /> protect human health, safety and the environment can be claimed for reimbursement. You must comply j <br /> with all regulatory agency time schedules and requirements and you must obtain three bids for any <br /> required corrective action. Unless waived in writing,you are required to obtain preapproval of costs for <br /> all future corrective action work. If you do not obtain three bids or a waiver of the three bid <br /> requirement, reimbursement is not assured and costs may be rejected as ineligible. . <br /> If you have any questions,please contact me at(916)341-5761. <br /> Sincerely, <br /> i <br /> Barbara Rempel <br /> Claims Review Unit <br /> Underground Storage Tank Cleanup Fund <br /> i <br /> cc: Mr. Gordon Boggs /Ms.Margaret La orio <br /> g g <br /> RWQCB,Reg. 5 -Sacramento San Joaquin County EHD <br /> 3443 Routier RoadP.O.Box 2009 <br /> Sacramento, CA 95827-3098 Stockton,CA 95201 <br /> - I <br /> I <br /> California EBviroBmentsIProtecdoR Agency <br /> RecycledPaper <br /> I <br />