My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0009937
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
S
>
SCOTTS
>
433
>
3500 - Local Oversight Program
>
PR0545678
>
ARCHIVED REPORTS_XR0009937
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/20/2020 11:44:05 AM
Creation date
5/20/2020 11:34:39 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0009937
RECORD_ID
PR0545678
PE
3528
FACILITY_ID
FA0005843
FACILITY_NAME
MASONITE CORPORATION
STREET_NUMBER
433
Direction
W
STREET_NAME
SCOTTS
STREET_TYPE
AVE
City
STOCKTON
Zip
95203
APN
14704044
CURRENT_STATUS
02
SITE_LOCATION
433 W SCOTTS AVE
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
88
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Site Background Information PremDor <br /> • Page 2 of 5 <br /> 1 <br /> PREVIOUS SITE ASSESSMENTS <br />' On 15 and 16 October 2002 three soil boringsB1 thou B3 were though a advanced to a depth of 35 feet <br /> below surface grade (bsg), utilizing a van-mounted Geoprobe 5400 direct-push probing unit <br />' equipped with 1 25-mch probing rods,for the collection and analysis of soil and`grab'groundwater <br /> samples After probing to a depth of 25 feet bsg, ground water was found to be at approximately 22 <br />' feet bsg Soil boring B 1 was advanced in the northwest comer of the former UST excavation Soil <br /> boring B2 was advanced approximately five feet east of the former UST excavation and soil boring <br /> B3 was advanced approximately ten feet southwest of the former UST excavation <br /> tA total of six soil samples were analyzed for petroleum hydrocarbon products TPH-g was detected <br /> in soil samples collected from all three borings at a maximum concentration of 22,000 milligrams <br />' per kilogram(mg/kg),in sample B2-15 TPH-d was detected in soil samples collected from bonngs <br /> B1 and B2 at a maximum concentration of 7,500 mg/kg in sample B2-15 BTEX compounds were <br /> detected in soil samples collected from all three bonngs at maximum concentrations of 1 I mg/kg, <br />' 460 mg/kg, 320 mg/kg and 1830 mg/kg, respectively, in sample B2-15 Lead was detected by EPA <br /> Method 6010B in one soil sample collected in boring B2 at a concentration of 59 mg/kg, in sample <br /> B2-15 No additional target analytes were detected at or above laboratory detection limits in the soil <br /> samples analyzed <br /> A grab ground water sample was collected from each of the three bonngs on 15 and 16 October 2002 <br /> and were analyzed for petroleum hydrocarbon products TPH-g was detected in ground water <br /> samples collected from each boring at a maximum concentration of 170,000µg/1 in boring B2 TPH- <br /> d was detected in ground water samples collected from bonngs B1 and B2 at a maximum <br /> concentration of 23,000µg/1 inboring B2 BTEX compounds were detected in groundwater samples <br /> collected from all three bonngs at maximum concentrations of 550 pg/1(B3),23,000µg/1(B 1),6,100 <br /> I <br /> 11g/1(B1) and 33,000 gg/1(B1), respectively 1,2-DCA was detected in ground water samples <br /> collected from all three borings at a maximum concentration of 54 µg/1 in sample B3 EDB was <br /> detected in ground water samples collected from all three bonngs at a maximum concentration of <br /> 190 µg/1 in sample B2 No additional target analytes were detected at or above laboratory detection <br /> limits in the ground water samples analyzed <br /> I On 09, 10 and 16 October 2003, four soil borings (MW1 through MW3 and B4)were advanced at <br /> the site A CME-75HT truck mounted drill ng or a CME-75 limited access drill ng were utilizing <br /> to advance 8 25-inch diameter hollow-stem augers to the total depth of each boring Pilot bonngs <br /> MWl, MW2 and MW3 were completed as ground water monitoring wells using 2-mch diameter <br /> PVC casing,with 0 020-inch slotted screen installed from approximately 14 feet to 34 feet bsg The <br /> filter pack(No 2/12 Lonestar sand)was installed from approximately 12 feet to 34 feet bsg, and a <br /> I nominal 2-foot bentonite chip plug was then installed above the filter pack and hydrated The wells <br /> were then grouted to near the surface with portland cement,and water-tight,traffic-rated well boxes <br /> rwere installed over the wells <br /> Advanced GeoEnvm mental,Inc <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.