YVAfC <br /> ATC Associates Inc. <br /> ]1]7 Lone Palm Avenue, Suite 201 <br /> Modesto,California 95351 <br /> 209-579-2221 <br /> ASS O C 1 ATE S IN C. Fax:209-579-2225 <br /> Wells Abandoned by Over Drilling <br /> The groundwater monitoring wells MW2 and MW3 will be abandoned by over-drilling the casing <br /> and sand pack using 8-inch diameter hollow-stem augers. Groundwater samples collected <br /> from these wells during the last groundwater sampling event in April 2010 contained detectable <br /> concentrations of chemicals of concern, therefore are required by SJCEHD to be abandoned by <br /> completely removing the well casing, screen, sand pack and grout sealant. These wells have <br /> been completed to total depths of 45 to 50 feet bgs. Once the over-drilling process has been <br /> completed, the wells will be backfill with a neat cement grout slurry mix from the base of the <br /> annulus to the surface using trem7e' pipe. <br /> Wells Abandoned by Pressure Grouting <br /> Groundwater monitoring wells MW1, MW4, MW5, and MW6 will be abandoned via pressure <br /> grouting. Prior to the abandonment, the well boxes and locking plugs and top three feet of <br /> casing will be removed from each well. The groundwater monitoring wells will be abandoned <br /> using pressure grouting methods, filling each well casing and filter pack with a neat cement <br /> grout slurry from the bottom via tremmie pipe. Well construction logs are provided as <br /> Attachment 1. <br /> The wells to be destroyed by pressure grouting processes will be completed using a specialized <br /> pressure-grouting tool. For protection of the annular seal at the land surface, a 24-inch <br /> diameter hole will be dug out around the well box locations to a depth of approximately 36 <br /> inches. The top 2.5 feet of well casing will be cut. During the sealing operation, the grout used <br /> to fill the wells will be made to overflow into the excavation and fill it to a thickness of one foot <br /> and form a cap which has a diameter of at least 24 inches. <br /> After the sealing material has set, the excavations will be filled to near surface grade with clean <br /> backfill material and the excavation will be capped with asphalt patch or concrete to restore the <br /> appearance of the paved surfaces at the site. <br /> Report Preparation <br /> Upon completion of the well destruction activities, a summary report will be prepared that will <br /> include a description of all well destruction field activities associated with the site and include <br /> records of waste disposal. ATC will also submit well destruction logs to the Department of <br /> --` w�'er Rescutces. <br /> Projected Schedule <br /> Once approval of this workplan has been received, ATC will submit a well destruction permit <br /> and associated fees and confirm the schedule for drilling activities. ATC will notify the SJCEHD <br /> at least 48_hours-prior-..to the commencement of any field activities. A summary report will be <br /> submitted within approximately 30 days following the completion of field activities. <br /> S:\Enviromental\62605-Thiemanns\REPORTS\WP-Well Abandonment 5 <br />