Laserfiche WebLink
TABLE OF CONTENTS <br /> Page # <br /> 1 0 EXECUTIVE SUMMARY 2 <br /> 20 BACKGROUND 3 <br /> 21 Facility Descnption 3 <br /> 22 Project History 3 <br /> 30 SCOPE OF WORK 4 <br /> 40 FIELD ACTIVITIES 6 <br /> 4.1 Soil Boring and Groundwater Monitoring Well Locations 6 <br /> 50 SOIL BORINGS 7 <br /> 51 Boring and Abandonment Methods 7 <br /> 52 Soil Sampling 7 <br /> 53 Field Screening of Soil Samples 8 <br /> 5.4 Analytical Results 9 <br /> 60 GROUNDWATER MONITORING 11 <br /> 61 Groundwater Monitonng Well Installation 11 <br /> 62 Groundwater Monitoring Well Development 12 <br /> 63 Groundwater Monitonng Well Purging 12 <br /> 64 Groundwater Sample Collection 12 <br /> 65 Analytical Results 13 <br /> 70 DISCUSSION OF DRILLING AND ANALYTICAL RESULTS 13 <br /> • 8.0 SITE GEOLOGY 14 <br /> 90 SITE HYDROGEOLOGY 14 <br /> 8.0 CONCLUSIONS 15 <br /> 90 RECOMMENDATIONS 16 <br /> 100 LIMITATIONS 17 <br /> EXHIBITS <br /> Exhibit 1 Vicinity Map <br /> Exhibit 2 Site Map, Cross Section, and Bonng Locations <br /> Exhibit 3 Well Diagram Monitonng Wells MW-1, 2, & 3 <br /> Exhibit 4 Groundwater Gradient Map <br /> Exhibit 5 Cross Section A-A' <br /> Exhibit 6 Cross Section B-B' <br /> Exhibit 7 Limit of TPI-Ig at 25 feet <br /> Exhibit 8 Limit of TPHg at 30 feet <br /> APPENDICES <br /> Appendix A Boring Logs <br /> Appendix B Laboratory Results and Chain of Custody <br /> Appendix C Well Purge Data Sheets <br /> 1 of 17 <br />