Laserfiche WebLink
• TIME SCHEDULE <br /> FOR SUBSURFACE INVESTIGATION <br /> at <br /> Former Thiemann's Service <br /> 106 West Second Street <br /> Ripon, California <br /> 5/03 - 6/20 Prepare workplan for off-site investigation, obtain right of way pernuts <br /> from City of Ripon, meeting with County, Client, and Consultant to revise <br /> workplan, prepare workplan addendum, and, obtain approval and permits <br /> from County <br /> 8/5 - 8/6 Coordinate drilling activities with subcontractor and San Joaquin County <br /> Public Health Services Environmental Health Division and mark the <br /> proposed boring locations for Underground Services Alert (USA) pending <br /> preapproval of costs <br /> 8/6 - 8/9 Advance soil borings and collect soil samples for laboratory analysis <br /> Complete three bonngs as vapor wells and two borings as sparge wells <br /> Samples will be analyzed on a standard two week turn around time <br /> Develop air sparge wells <br /> 8/12 - 8/16 Prepare workplan for conducting vapor extraction and air sparge pilot <br /> testing <br /> 8/26 -8/30 Conduct pilot testing <br /> 9/3 - 10/11 Prepare Corrective Action Plan for site <br /> W 194373\prescIidoc <br />