Laserfiche WebLink
1 � v <br /> lY <br /> ASSOC IATES INC <br /> TABLE OF CONTENTS <br />' CONTENT PAGE <br /> 1 1.0 INTRODUCTION................. .............. ..............................................1 <br /> 11 Site Location 1 <br /> 1 12 Background Information 1 <br /> 1 2.0 SUBSURFACE CONDITIONS ....................................................................................2 <br /> 21 Hydrogeology 2 <br /> 3.0 GROUNDWATER PUMPING PILOT TEST.............................................................2 <br /> 31 Groundwater Pumping Test Methods and Procedures 3 <br /> 32 Analysis of Groundwater Pumping Test Data 3 <br />' <br /> 33 Analysis of Groundwater Pumping Test Data Using AQTESOLVIM 3 <br /> 34 Groundwater Sampling and Analysis 4 <br /> 3 5 Results of Groundwater Pumping Test 4 <br /> 4.0 DISCUSSION................................................................................................................5 <br /> 1 5.0 RECOMMENDATIONS ........ ....... .............................................................................5 <br /> 6.0 REFERENCES..............................................................................................................6 <br /> 1 <br /> 1 <br /> t <br /> i <br /> 1 ' <br />