Laserfiche WebLink
A �> GROUNDWATER SAMPLING FORM <br /> -T PROJECT INFORMATION <br /> PROJECT NAME f VI tw�a �S _ PROJECT NUMBER 4� ,"( WELL NO MVM 2, <br /> PROJECT MANAGER TYPE OF WELL 4l Monitoring Extraction Other <br /> RECORDED BY SAMPLED BY A-F DATE OTI O 2- <br /> WELL PURGING INFORMATION <br /> PURGE VOLUME PURGE METHOD <br /> Well asing Diameter - � <br /> 2-inch 4-Inch Other Bader - Type <br /> Pump - Type <br /> Well Total Depth _461 feet below Top of Casing,TD Other - Specify <br /> Depth to Water z- 1 �// feet below Top of Casing,WL Hydrocarbon Odo <br /> Water Column Length 1 N3 feet Yes No <br /> Purge Volume Calculation (WaterColumnLength x Multiplier x No/Volumes = Calculated Purge Volume) <br /> 2 I VI X 0 + )—T" <br /> f 1 X DC7 f Calculated Purge Volume = gallons <br /> (WCL) (Multiplier) (No Volumes) Actual Purge Volume = allons <br /> Mu#JpffeF (C4=a Diameter [InchesT Gailons/llnear foot 2=017 4=05B (3=15 8=26 <br /> Groundwater Parameter Measurement Meter Type &X Calibrated bpYes No <br /> TIME ELAPSED FLOWRATE DTW pH EC TURBIDITY REDOX COMMENTS <br /> TIME (GPM) (tt) umhoslcm (NTU) mV <br /> (Ck is,ul10 <br /> In -7 5 Or -Z- It 0 1 ilmry <br /> cilt 711 L (16- <br /> r ? � <br /> \TAWA <br /> i <br /> SSOCIATES INC. <br /> ENWROMMENTAI„C3EOTECFINICAL AND MATERIALS PROFESSIONALS <br />