Laserfiche WebLink
i <br /> GROUNDWATER SAMPLING FORM <br /> PROJECT INFORMATION <br /> PROJECT NAME f le_yAaKv+`-%. S"-tiCr, PROJECT NUMBER S'! eco! WELL NO _ M <br /> PROJECT MANAGER TYPE OF WELL j/Monttonng Extraction Other <br /> RECORDED BY F SAMPLED BY Arf DATE 9 <br /> WELL PURGING INFORMATION <br /> PURGE VOLUME PURGE METHOD <br /> We!�sing Diameter <br /> 2-,nctt 4-inch Other <br /> _ ---/Bailer - Type .q <br /> Well Total Oepth 440,25- feet below Tap of Casing,TD Pump - Type <br /> Other - Specify <br /> Depth to Water feet below Top of Casing,WL Hydrocarbon Odors <br /> Water Column Length 151 S4 feet Yes o <br /> Purge Volume Calculation (Water Column Length x Mulbplier x No Volumes = Calculated Purge Volume) <br /> SIS X d X = -7.q3 Calculated Purge Volume = 71 S —gallons <br /> (WCL) (Mulgplier) (No Volumes) Actual Purge Volume 12 Z ^gallons <br /> Mutt! tier Casa Diameter nches = GallonsnMear foot _2=01T 4=0-66 6=15 B=26 <br /> Groundwater Parameter Measurement Meter Type Calibrated _LA,_No <br /> TIME ELAPSED FLOWRATE DTW pH EC TEMP TURBIDITY REDOX COMMENTS <br /> TIME (GPM (ft) cnhaslcm 4� (NTLI) mV <br /> dog F <br /> �t73ro f. -ZA7 gq !, 7-q,t3 OAN s% A <br /> ir <br /> 1080 y1 Z7 pvcum 3 <br /> o� '27, y l �, x <br /> o 2 2? -42 eo 4 2z al, <br /> i <br /> ITAC <br /> I <br /> ASSOCIATES INC. <br /> &MRONMENTAL.GEOTECHNICAL AND MATERIALS PROFESNONALS <br />