Laserfiche WebLink
-11. Please include a copy of any studies ( soils, geology, marketing, <br /> etc. ) that you may have had prepared for this project or project <br /> site . <br /> C . PROJECT CHARACTERISTICS <br /> 1. Services: Indicate how the following services will be provided <br /> for your project and availability of service. <br /> a . Water Supply: <br /> * Currantl y well wat r on Rite, Anticipate using Lathroj? Water <br /> b. Sewage Disposal: Sept-i� tank & filter hed_ District <br /> C. Storm Drainage: Dra i nage pnnd located in S_E. corner <br /> If an extension of any of the above is necessary, indicate <br /> which service( s ) , what agency will be providing` the�" <br /> service(s ) , and the distance of the extension(s ) : <br /> * r.nthrnp watar District will hp sugnl_ yirrQ water ..to..:our _faciitt es. <br /> d. Natural Gas : N/A <br /> e. Electricity: P.G. & E. - Anticipate power requirement of 400 amps <br /> f . Road/Access ( i .e . , paved, unpaved, public/private, road name) : <br /> Unnaved <br /> g . Fire: Hydrant Distance to nearest fire station: one mile <br /> h. Schools: union High School - one mile <br /> 2 . Describe any site alterations which result from the proposed pro- <br /> ject ( specifically address the amount and location of grading, <br /> cuts and fills, vegetation removal, alterations to drainage, <br /> removal of existing structures, number of trees removed, etc. ) . <br /> N/A <br /> 3. Air Quality Information: <br /> Number and type of vehicles associated with completed project <br /> 3 - cranes; 2 - forklifts; 3 - ready mix trucks <br /> Types of emissions and sources associated with project <br /> Exhaust fumes from the above equipment. <br /> Fuel sources (and amounts ) to be consumed by or as a result of the <br /> completed project The above equipment uses approximately 5000 gallons <br /> of diesel per month <br /> Will the project result in substantial air emissions or deteriora- <br /> tion of ambient air quality? x NO YES <br /> 4 . How much agricultural land will be removed from production? <br /> None - Land is zoned industrial <br /> Irrigated Not irrigated <br /> Site Approval Application - 7 - ( 6/86 ) <br />