Laserfiche WebLink
K,HF Environmental Consultants, fnc- <br /> .health & Safety Plan for Langston's Market <br /> Fuge• 4 <br /> i <br /> i2.2 General Safety <br /> i The on-site Safety Officer will be responsible for the following daily safety <br /> implementations <br /> i2.3 Daily Safety Meetings <br /> Each day prior to commencing work, a safety meeting shall be held to discuss safety <br /> i considerations for the day's work to be done A safety topic shall be addressed each day <br /> from the following list <br /> Site Safety Plan (first day and once a week thereafter) <br /> • Ftre Fighting Techniques <br /> i ! Defensive Driving <br /> • Decontamination <br /> * Levels of Protection <br /> +� Heat Stress <br /> e Emergency Equipment on Site <br /> • Confined Space Entry Procedure <br /> i ! Respirator Maintenance <br /> d Salf-contained Breatlung Apparatus Training (:f necessa.�,j <br /> i2.4 Safety Log <br /> iA safety Iog shall be kept for the project work site <br /> 2.S Eating, Drinking, Smoking <br /> iEating, drinking, and smoking shall be allowed only in the designated areas in the support <br /> zone No personnel may eat, drink, or smoke on-site to any other area except as pernutted <br /> iby the SSO <br /> 2.6 Safety Plan Acknowledgment Sheet <br /> i All personnel visitor or working at the site shall read and certify to reading tins SSP by <br /> p g g <br /> appropriately completing the Safety Plan Acknowledgment Sheet attached to this plan <br /> i <br />