Laserfiche WebLink
TABLE OF CONTENTS <br /> Page <br /> 1.0. INTRODUCTION 1 <br /> 2.0. BACKGROUND 1 <br /> 3.0. SCOPE OF WORK 2 <br /> 31 PERMITTING AND PRE-FIELD WORK ACTIVITIES 2 <br /> 32 SOIL SAMPLE COLLECTION AND ANALYSIS 2 <br /> 3 3 MONITORING WELL INSTALLATION AND DEVELOPMENT 3 <br /> 34 GROUND WATER MONITORING PROGRAM 3 <br /> 35 REPORT PREPARATION 4 <br /> 4.0. FIELD PROCEDURES 4 <br /> 41 SOIL SAMPLING PROCEDURES 4 <br /> 42 MONITORING WELL INSTALLATION 5 <br /> 43 WELL DEVELOPMENT 6 <br /> 44 GROUND WATER SAMPLING PROCEDURES 6 <br /> 4 4 1 Static Water Level Measurements 6 <br /> • 4 4 2 Well Evacuation 6 <br /> 4 4 3 Sample Withdrawal 7 <br /> 4 4 4 Sample Handling 7 <br /> 45 EQUIPMENT DECONTAMINATION 7 <br /> FIGURES <br /> Figure 1 -Location Map <br /> Figure 2 - Site Plan <br /> Figure 3 - Proposed Well Design <br /> n <br /> Advanced GeoEnvironmenta4 Inc <br />