My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0010176
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
S
>
SEVENTH
>
15615
>
3500 - Local Oversight Program
>
PR0545683
>
ARCHIVED REPORTS_XR0010176
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/20/2020 4:04:49 PM
Creation date
5/20/2020 3:45:57 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0010176
RECORD_ID
PR0545683
PE
3528
FACILITY_ID
FA0005408
FACILITY_NAME
LANGSTON ARCO*
STREET_NUMBER
15615
Direction
E
STREET_NAME
SEVENTH
STREET_TYPE
ST
City
LATHROP
Zip
95330
CURRENT_STATUS
02
SITE_LOCATION
15615 E SEVENTH ST
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. 14 August 2001 <br /> AGE-NC Project No 98-0511 <br /> Page 6 of 7 <br /> Following completion of the monitoring well, well elevation and location will be surveyed by a <br /> California-licensed surveyor <br /> 4 3 WELL DEVELOPMENT <br /> Development will consist of a combination of bailing to remove the mayor portion of fine-grained <br /> sediment from Inside the well, surging to flush out or draw In sediment from the filter pack, and <br /> additional balling to finish the removal of sediment Development activities will be continued until <br /> field parameter (pH, electrical conductivity, and temperature) readings have stabilized or until <br /> approximately 10 casing volumes of water have been purged from the well <br /> 4 4 GROUNDWATER SAMPLING PROCEDURES <br /> Groundwater sample collection will be performed In accordance with RWQCB sampling protocols <br /> Ground water sampling procedures are detailed below <br /> • <br /> 4 4 1 Static Water Level Measurements <br /> Prior to purging and sampling during quarterly groundwater monitoring events,static water level will <br /> be measured using an electric water level Indicator Water level data will be recorded to the nearest <br /> 0 01-foot from a reference point marked on the top of the PVC well casing Before and after each <br /> use, the measurement device will be rinsed with water <br /> 4 4 2 Well Evacuation <br /> Following depth to water measurements and prior to sampling, the well wllI be purged using a <br /> disposable bailer to ensure that the sample collected will be representative of the aquifer rather than <br /> water standing In the well casing The well will be purged until 1)a minimum of three casing-water <br /> volumes Is removed from the well, and 2) the field-measured ground water parameters have <br /> stabilized However, If the well Is purged dry prior to evacuating three casing-water volumes, a <br /> ground water sample will be collected following 80 percent recovery of ground water within the well <br /> or within 8 hours of well evacuation <br /> Advanced GeoEnvi ron mental,Inc <br />
The URL can be used to link to this page
Your browser does not support the video tag.