Laserfiche WebLink
5. All of material reported at maximum quantity below 55 gallons, 500 pounds, or 200 cubic feet are not <br /> required to be reported however, will be included in the annual billing if not removed from the chemical <br /> inventory. <br /> • Violation #6,the site maps do not show or address the following: <br /> 1. Maps 1, 2, 3 and 5 do not contain a North orientation. <br /> 2. The location of the waste paint. <br /> A site map shall contain a north orientation, loading areas, internal roads, adjacent streets, storm and sewer drains, <br /> access and exit points, emergency shutoffs, evacuation staging areas, hazardous material handling and storage areas, <br /> and emergency response equipment. If a site map element is not applicable for your facility then list it on the map and <br /> label as "NA". <br /> • Violation #7, Emergency Response/Contingency Plan is not complete. <br /> Section G. element G2 is not complete/accurate (the location of each item checked is not identified and <br /> the grid locations do not refer to any of the 5 maps submitted). <br /> • Violation#8, the Employee Training Plan has not been submitted; employee training records and <br /> material were uploaded in lieu of an Employee Training Plan. <br /> ■ A training plan must address training for all new employees and annual training, including refresher <br /> courses,for all employees in safety procedures in the event of a release or threatened release of a <br /> hazardous material, including, but not limited to: <br /> 1. Familiarity with the emergency response plans and procedures in the event of a release or <br /> threatened release of a hazardous material. <br /> 2. Immediate notification contacts to the appropriate local emergency response personnel and <br /> to the unified program agency. <br /> 3. Procedures for the mitigation of a release or threatened release to minimize any potential <br /> harm or damage to persons, property, or the environment. <br /> 4. Evacuation plans and procedures, including immediate notice, for the business site. <br /> ➢ As an alternate to uploading a separate employee training plan; you may refer to the training elements outlined in <br /> Section 1 of the Emergency Response/Contingency Plan template provided in CERS. This is accomplished by <br /> discarding the uploaded document, choosing "Provided Elsewhere in CERS'; then choosing "Emergency <br /> Response and Training Plans". <br /> • Violation #11—The training record does not show the required training elements (see 1 and 2 below) have <br /> been addressed. You may refer to the attached sample training document. <br /> 1. Familiarity with the emergency response plans and procedures in the event of a release or threatened <br /> release of a hazardous material; (Emergency Response/Contingency Plan familiarization). <br /> 2. Immediate notification contacts to the appropriate local emergency response personnel and to the <br /> unified program agency; (spill reporting). <br /> 2 <br />