Laserfiche WebLink
Smith Technology SITE SAFETY PLAN <br /> Physical Hazards <br /> HazardM t <br /> Sk(S <br /> T ' <br /> ............ <br /> ............................. gation Measure. <br /> 1 Heavy Equipment(Noise& Physical All heavy equipment used on this project will <br /> contact) be in good working order and operated in <br /> accordance with recognized industry standards <br /> and Cal-OSHA Title 8, Subchapter 4, <br /> Construction Safety Orders. In addition, an <br /> exclusion zone applies to all personnel. The <br /> exclusion zone will be 20 feet to the front and <br /> either side of the operating drill rig. Personnel <br /> will not be allowed under booms or augers at <br /> any time. <br /> All equipment operators and ground crews <br /> working in close proximity of heavy equipment <br /> will be supplied with ear protection. <br /> Dust The dust hazard will be mitigated by not <br /> allowing ground crew to be located down wind <br /> of drilling and excavation activity. In addition, <br /> water will be applied to control the dust if <br /> visible levels of dust are generated. <br /> PACE 6 <br />