Laserfiche WebLink
AZ <br /> Smith Technology Corporation <br /> Quality Assurance/Quality Control Plan <br /> Revised February 1995 <br /> This sample will be immediately placed into a cooler containing dry ice or frozen chemical ice. <br /> A "high-low" temperature recording thermometer will accompany sample shipments to ensure <br /> proper temperature maintenance. The samples will be delivered to a state certified laboratory <br /> following under chain-of-custody protocol within 48 hours of sampling,whenever possible. <br /> Soil in the uppermost brass tube will be described according to ASTM standard practice for <br /> descriptiowand identification of soils (ASTM D-2488-84). Stratigraphic, genetic and other <br /> data/interpretations will also be recorded. Soil properties may also be determined from the <br /> middle brass tube and from the.sampler shoe. Alternatively the second-sample tube may be <br /> used with the uppermost tube for preparation of duplicates. These field observations will be <br /> noted on a log prepared for each boring/well. <br /> a <br /> During sampling, latex gloves will be worn to prevent cross-contamination with other samples. <br /> The disposable gloves will be discarded after collecting samples from each 18-inch sample <br /> drive. <br /> Soil samples will be collected at 5-foot intervals, at significant changes in lithology and intervals <br /> of obvious contamination in order to develop a complete profile of soil contamination. <br /> 11.2 Sample Collection During Tank Removal <br /> Soil samples will be collected as soon as possible after removal of the tank. Where feasible, all <br /> preparations for soil sampling will be made prior to tank removal. Soil samples collected from <br /> a backhoe bucket or directly from the excavation floor will be collected in a thin-walled <br /> i <br /> stainless steel or brass cylinder at least 3-inches long by ]-inch in diameter. From 3 to 24- <br /> WAAdminlShe11s1QAQC-97.DOC <br /> 11 <br />