My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE HISTORY
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
S
>
SHAW
>
1282
>
2900 - Site Mitigation Program
>
PR0545687
>
SITE HISTORY
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/21/2020 9:42:17 AM
Creation date
5/21/2020 9:33:31 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE HISTORY
RECORD_ID
PR0545687
PE
3528
FACILITY_ID
FA0003759
FACILITY_NAME
ST&E Roundhouse
STREET_NUMBER
1282
STREET_NAME
SHAW
STREET_TYPE
Rd
City
Stockton
Zip
95215
APN
14327016
CURRENT_STATUS
02
SITE_LOCATION
1282 Shaw Rd
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BACKFILL. EXCAVATION CERTIFICATE <br /> Project Location lZSZ �. sr¢LrJ eo�-1� , sTcl�,�7�i✓ �}UF�QA <br /> Owner 4:72W Tf41;11 14V-7r Phone No a"! '�6 7001 <br /> Contractor ROtl, iV Phone No. ) License No. 7383F 3 g trf`�L <br /> INDICATE METHOD OF BACKFILL QUALITY ASSURANCE <br /> 1. Submission of Soil Engineer's Compaction Report within 30 days of project completion, or <br /> 2. Submission of verification,e.g., load ticket, within 30 days of project completion that one of the following materials was <br /> placed in the excavation in 12" lifts: <br /> T A. Pea gravel--smooth, rounded material not more than one-half(112) inch in diameter <br /> ✓ B. Crushed tock--self-compacting material not more than three-quarters (3I4) inch in cross sectional <br /> . measurement. (Use of crushed rock will not be permitted for backfill if coatact will be made between the <br /> backfill material and tanks/pipes made of poly resin glass or similar materials.) <br /> DECLARATION <br /> I hereby certify that a Soil Engineer's Compaction Repots will be submitted within.30 days of project completion,or submission of <br /> verification that the select material described above will be placed at a minimum of five (S) cubic.yards per 1000 gallon tank <br /> displacement and that the entire excavation will be backfilled and compacted to insure compliance with the Uniform Building Code <br /> Appendix Chapter 70. <br /> * /✓1�2Ll�✓�JO'd��iY <br /> Name t <br /> Tide (Prat)I <br /> ignamre <br /> * Shall be the responsible managing employee on the license or authorized agent. <br /> 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.