Laserfiche WebLink
Ileal tt) art(] Safety Plan <br /> Underground Tank Removal <br /> IOver-Excavation Resample <br /> INTRODUCTION <br /> PURPOSE AND SCOPE <br /> The stealth and Safety Plan, for underground tank removal/ over--excavation, <br /> I provides for the protection of on-site persor)nel and the surroundir)g <br /> community during site characterizatlon activities. The requirements, <br /> specifications and procedures presented with this pial) will apply Lo all <br /> personnel on-site, 1nG11.1cllrig employees, sub-contractor's, site visitors and <br /> I regulatory agency personnel . <br /> I <br /> i <br /> KEY PERSONNEL <br /> I <br />' HAZARD ANALYSIS ! <br /> i <br /> The most significant risk associates! Witt) petroleuin contaminated soil is <br /> expo9ure to aromatic cornpounds. Skin contact will be eliminated by use of I <br /> clothing, eye wear, and gloves and the inhalation hazard will be )minimized <br /> using appropriate respiratory protective devices as determined by on-site <br /> I air monitoring. The Safety Coordlnator/Pro,ject Manager will establish an <br /> exclusion zone encompassing a 50 foot radiuifrom the work area. Access <br /> within this zone will be limited to requlred personnel . Total organic <br /> vapors will be moriltored within the exclusion zone using a pliotoionization i <br />' detector, (PIU) calibraLed for benzene the )host toxic of the aromatic <br /> hydrocarbons. Cur•r'ent enforceable and recarrmended exposure limitations <br /> for potential site contaminar)ts are pr esenLed in !able 1 . <br /> E <br /> i <br /> I <br /> I <br /> i <br />